作者
Erfan Babaee Tirkolaee, Alireza Goli, Gerhard-Wilhelm Weber
发表日期
2020/5/28
期刊
IEEE Transactions on Fuzzy Systems
卷号
28
期号
11
页码范围
2772-2783
出版商
IEEE
简介
Flow shop scheduling (FSS) problem constitutes a major part of production planning in every manufacturing organization. It aims at determining the optimal sequence of processing jobs on available machines within a given customer order. In this article, a novel biobjective mixed-integer linear programming (MILP) model is proposed for FSS with an outsourcing option and just-in-time delivery in order to simultaneously minimize the total cost of the production system and total energy consumption. Each job is considered to be either scheduled in-house or to be outsourced to one of the possible subcontractors. To efficiently solve the problem, a hybrid technique is proposed based on an interactive fuzzy solution technique and a self-adaptive artificial fish swarm algorithm (SAAFSA). The proposed model is treated as a single objective MILP using a multiobjective fuzzy mathematical programming technique based on …
引用总数
2019202020212022202320241743506423