作者
Mehrdad Arashpour, Ron Wakefield, Nick Blismas, EWM Lee
发表日期
2014/2/1
期刊
Journal of construction engineering and management
卷号
140
期号
2
页码范围
04013053
出版商
American Society of Civil Engineers
简介
Operational performance in residential construction production systems is assessed based on measures such as average house-completion time, number of houses under construction, lead time, and customer service. These systems, however, are prone to nonuniformity and interruptions caused by a wide range of variables such as inclement weather conditions, accidents at worksites, fluctuations in demand for houses, and rework. The availability and capacity of resources therefore are not the sole measures for evaluating construction production systems capacity, especially when rework is involved. The writers’ aim is to investigate the effects of rework timeframe and frequency/length on tangible performance measures. Different call-back timeframes for rework and their impact on house-completion times are modeled and analyzed. Volume home-building was chosen as the industry sector studied in the research …
引用总数
2014201520162017201820192020202120222023202427789996883
学术搜索中的文章
M Arashpour, R Wakefield, N Blismas, EWM Lee - Journal of construction engineering and management, 2014