作者
Alireza Goli, Erfan Babaee Tirkolaee, Mehdi Soltani
发表日期
2019/1/1
期刊
Production & Manufacturing Research
卷号
7
期号
1
页码范围
294-315
出版商
Taylor & Francis
简介
Scheduling is known as a great part of production planning in manufacturing systems. Flow Shop Scheduling (FSS) problem deals with the determination of the optimal sequence of jobs processing on machines in a fixed order. This paper addresses a novel robust FSS problem with outsourcing option where jobs can be either scheduled for inside or outsourced to one of the available subcontractors. Capacity limitation for inside resource, just-in-time delivery policy and uncertain processing time are the key assumptions of the proposed model. The objective is to minimize the total-weighted time required to complete all jobs and the total cost of outsourcing. So, a Robust Mixed-Integer Linear Programming (RMILP) model is proposed to accommodate the problem with the real-world conditions. Finally, the obtained results show the effects of the robustness in optimizing the model under uncertainty condition. Moreover …
引用总数
201920202021202220232024413141374
学术搜索中的文章