作者
T Miranda, D Dias, S Eclaircy-Caudron, A Gomes Correia, L Costa
发表日期
2011/11/30
期刊
Tunnelling and Underground Space Technology
卷号
26
期号
6
页码范围
659-673
出版商
Pergamon
简介
One of the major difficulties for geotechnical engineers during project phase is to estimate the geomechanical parameters values of the adopted constitutive model in a reliable way. In project phase, they are normally evaluated by laboratory and in situ tests and, in the specific case of rock masses, by the application of empirical classification systems. However, all methodologies lead to uncertainties due to factors like local heterogeneities, representativeness of the tests, etc. In order to reduce these uncertainties, geotechnical engineers can use inverse analysis during construction, using monitoring data to identify the parameters of the involved formations. This paper shows the back analysis of geomechanical parameters by the optimisation of a 3D numerical model of the hydroelectric powerhouse cavern of Venda Nova II built in Portugal. For this purpose, two optimisation techniques were considered: one classical …
引用总数
20122013201420152016201720182019202020212022202320241978848936866
学术搜索中的文章
T Miranda, D Dias, S Eclaircy-Caudron, AG Correia… - Tunnelling and Underground Space Technology, 2011