作者
Arturo Magana-Mora, Salem Gharbi, Abrar Alshaikh, Abdullah Al-Yami
发表日期
2019/3/15
研讨会论文
SPE Middle East Oil and Gas Show and Conference
页码范围
D032S077R003
出版商
SPE
简介
Thorough preplanning and best drilling practices are effective in reducing stuck pipe incidents, data analytics offer additional insight into further reducing the significant non-productive time (NTP) that results from this unplanned event. The severity of the stuck pipe problem may stop the drilling operations for a short time, or in more difficult cases, the drill string has to be cut and the borehole is sidetracked or plugged and abandoned. Consequently, detecting the early signs of this problem, in order to take the right actions, may considerably or entirely reduce the risk of a stuck pipe.
Although computational models have been proposed for the early detection of the stuck pipe incidents, the models are derived from a reduced set of wells with stuck pipe incidents, which may result in under-trained models that predict a large number of false positive alarms. A sufficient amount of data or wells that statistically …
引用总数
20202021202220232024518532
学术搜索中的文章
A Magana-Mora, S Gharbi, A Alshaikh, A Al-Yami - SPE Middle East Oil and Gas Show and Conference, 2019