作者
Debiao Meng, Tianwen Xie, Peng Wu, Chao He, Zhengguo Hu, Zhiyuan Lv
发表日期
2021/8/1
期刊
Structures
卷号
32
页码范围
997-1004
出版商
Elsevier
简介
Generally, the traditional uncertainty-based multidisciplinary design optimization (UBMDO) methods are based on the probability distribution information of random design variables and parameters. However, the probability distribution information needs to be obtained based on a large number of sample points. In many engineering structure design problems, for some uncertainties, it is difficult to obtain enough experimental samples to construct their accurate probability distribution, only the variation interval of them can be known. In this situation, mixed uncertainties exist in the engineering systems. Furthermore, with the increase in the complexity of engineering systems, these mixed uncertainties will even produce cumulative effects along with the internal coupling of the systems themselves. To tackle these challenges, the random and interval variables (RIV) are considered and a strategy of UBMDO with RIV …
引用总数