作者
Alan D Russell, Malik Ranasinghe
发表日期
1991/9/1
期刊
Construction Management and Economics
卷号
9
期号
5
页码范围
467-479
出版商
E. & FN Spon
简介
A deterministic analysis framework that permits the computation of an upper bound on the constant dollar expenditure that should be made to fast-track a project to achieve a specified duration is presented. It employs a baseline plan which corresponds to the traditional method of sequential design, construct, commission and operate, and the economic principle that one will continue to spend as long as the return on the incremental investment equals or exceeds the minimum attractive rate of return. The analysis is based on a generalized definition of fast-track construction, which includes ouerlapping of the construction and revenue phases and acceleration as well as overlapping of design and construction. An example is giuen to illustrate application of the framework.
引用总数
1992199319941995199619971998199920002001200220032004200520062007200820092010201120122013201420152016201720182019202020212022202320241111311113211112112
学术搜索中的文章