作者
P Udhayakumar, S Kumanan
发表日期
2010/10
期刊
The International Journal of Advanced Manufacturing Technology
卷号
50
页码范围
1075-1084
出版商
Springer-Verlag
简介
Many optimization problems from the manufacturing systems are very complex in nature and quite hard to solve by conventional optimization techniques. The theme of this paper is to generate an active schedules and optimal sequence of job and tool that can meet minimum makespan schedule for the flexible manufacturing system. It consists of similar work center which is capable of doing many operations. The tools are stored in a common tool magazine that shares with and serves for several work centers to reduce the cost of duplicating tools in each and every work center. This type of manufacturing system is used for a manufacturing environment in which tools are expensive. To achieve the objective, the jobs and tools are sequenced and scheduled. In this work, non-traditional optimization technique such as ant colony optimization (ACO) algorithm are proposed to derive near-optimal solutions which …
引用总数
201020112012201320142015201620172018201920202021202220232024128583106331051
学术搜索中的文章