作者
Fan Peng, Seungmo Kang, Xiaopeng Li, Yanfeng Ouyang, Kamalesh Somani, Dharma Acharya
发表日期
2011/2/1
期刊
Computer‐Aided Civil and Infrastructure Engineering
卷号
26
期号
2
页码范围
129-145
出版商
Blackwell Publishing Inc
简介
Every year, billions of dollars are spent on rail track maintenance to keep the serviceability of the railroad network. These maintenance projects (of different types) must be performed by suitable maintenance teams within a planning horizon. This article presents a time‐space network model to solve the track maintenance scheduling problem (TMSP). The objective is to minimize the total travel costs of the maintenance teams as well as the impact of maintenance projects on railroad operation, which are formulated by three types of side constraints: mutually exclusive, time window, and precedence constraints. An iterative heuristic solution approach is proposed to solve the large‐scale TMSP model with a large number of side constraints. The proposed model and solution approach are applied to a large‐scale real‐world problem. Compared to the current industry practice the model outcome eliminated all hard side …
引用总数
2010201120122013201420152016201720182019202020212022202320241361791517101212810583
学术搜索中的文章
F Peng, S Kang, X Li, Y Ouyang, K Somani, D Acharya - Computer‐Aided Civil and Infrastructure Engineering, 2011