作者
Atul Porwal, Kasun N Hewage
发表日期
2013/5/1
期刊
Automation in construction
卷号
31
页码范围
204-214
出版商
Elsevier
简介
Organizational and people centered issues pose the greatest challenge for Building Information Modeling (BIM) implementation. Studies showed that BIM implementation is still a challenge for the North American construction industry. The Canadian construction industry, in contrast, is well behind that of the U.S. in its BIM adoption rate. Maturity and adoption of BIM depends mainly on the client or the owner in construction projects. Public sector clients often think that the market is not ready for BIM and are afraid to increase project costs by limiting competition. Moreover, if the contractor is not integrated in the project in the design phase, BIM has limited power. This paper proposes a ‘BIM partnering’ based public procurement framework to ensure ‘best value’ in construction projects. The case study presented in the paper proved the feasibility of proposed BIM based procurement in publicly-funded construction …
引用总数
201320142015201620172018201920202021202220232024163851479679908378635131