作者
Kristijan Frlan, Renata Rubesa, Ante Marusic
发表日期
2007/9/26
研讨会论文
AFRICON 2007
页码范围
1-6
出版商
IEEE
简介
One of the basic ways to improve the safety of either a part or the whole of the power system (PS) is construction of new overhead power lines. Since such interventions in the system are rare nowadays for economic, as well as ecological reasons, every significant alteration requires detailed analyses of the influence of line construction on the entire power system. In this paper the influence of the construction of new lines on the relay protection system has been described. Power system has been modeled by using the CAPE software and relay protection operation has been analysed. The first part of this paper describes the power system before reconstruction. Accuracy of the software model has been tested by comparison with the real faults in the network recorded by numerical relays. Distribution of fault current in the current and new system configuration has been shown by analysing the single-phase high …
引用总数