作者
Jane Matthews, Peter ED Love, Sam Heinemann, Robert Chandler, Chris Rumsey, Oluwole Olatunj
发表日期
2015/10/1
期刊
Automation in Construction
卷号
58
页码范围
38-47
出版商
Elsevier
简介
Having timely access to information on the performance of a construction project enables the design team and contractor to improve their decision-making so as to ensure project deliverables are met. This paper examines the effectiveness of cloud-based BIM for real-time delivery of information to support progress monitoring and management of the construction of a reinforced concrete (RC) structure using action based research. To undertake this task, existing paper-based processes were re-engineered to accommodate the use of cloud-based BIM during construction. The design and implementation of a real-time object oriented bi-directional system, allowed information (e.g., the status of the ‘As-Built’ schedule) to be captured on-site and synchronized with a federated BIM. As a result of adopting cloud-based technology during construction, a new object oriented workflow and processes for progress management …
引用总数
20152016201720182019202020212022202320242112420252929342110
学术搜索中的文章