关注
Cai Jingcao; 蔡劲草
Cai Jingcao; 蔡劲草
Anhui Polytechnic University; Wuhan University of Technology
在 whut.edu.cn 的电子邮件经过验证
标题
引用次数
引用次数
年份
A review of visual SLAM methods for autonomous driving vehicles
J Cheng, L Zhang, Q Chen, X Hu, J Cai
Engineering Applications of Artificial Intelligence 114, 104992, 2022
992022
Dynamic shuffled frog-leaping algorithm for distributed hybrid flow shop scheduling with multiprocessor tasks
J Cai, R Zhou, D Lei
Engineering Applications of Artificial Intelligence 90, 103540, 2020
932020
Two-level imperialist competitive algorithm for energy-efficient hybrid flow shop scheduling problem with relative importance of objectives
M Li, D Lei, J Cai
Swarm and Evolutionary Computation 49, 34-43, 2019
862019
Flexible job shop scheduling problem using an improved ant colony optimization
L Wang, J Cai, M Li, Z Liu
Scientific Programming 2017 (1), 9016303, 2017
862017
An imperialist competitive algorithm with memory for distributed unrelated parallel machines scheduling
D Lei, Y Yuan, J Cai, D Bai
International Journal of Production Research 58 (2), 597-614, 2020
762020
An improved artificial bee colony for multi-objective distributed unrelated parallel machine scheduling
D Lei, Y Yuan, J Cai
International Journal of Production Research 59 (17), 5259-5271, 2021
752021
An adaptive artificial bee colony with reinforcement learning for distributed three-stage assembly scheduling with maintenance
J Wang, D Lei, J Cai
Applied Soft Computing 117, 108371, 2022
692022
A shuffled frog-leaping algorithm with memeplex quality for bi-objective distributed scheduling in hybrid flow shop
J Cai, D Lei, M Li
International Journal of Production Research 59 (18), 5404-5421, 2021
552021
A novel shuffled frog-leaping algorithm with reinforcement learning for distributed assembly hybrid flow shop scheduling
J Cai, D Lei, J Wang, L Wang
International Journal of Production Research 61 (4), 1233-1251, 2023
472023
A cooperated shuffled frog-leaping algorithm for distributed energy-efficient hybrid flow shop scheduling with fuzzy processing time
J Cai, D Lei
Complex & Intelligent Systems 7 (5), 2235-2253, 2021
442021
Fuzzy distributed two-stage hybrid flow shop scheduling problem with setup time: collaborative variable search
J Cai, R Zhou, D Lei
Journal of intelligent & fuzzy systems 38 (3), 3189-3199, 2020
382020
A variable interval rescheduling strategy for dynamic flexible job shop scheduling problem by improved genetic algorithm
L Wang, C Luo, J Cai
Journal of Advanced Transportation 2017 (1), 1527858, 2017
362017
Trajectory planning of an autonomous mobile robot by evolving ant colony system
L Wang, C Luo, M Li, J Cai
International Journal of Robotics and Automation 32 (4), 1500-1515, 2017
342017
An adaptive multi-population genetic algorithm for job-shop scheduling problem
L Wang, JC Cai, M Li
Advances in Manufacturing 4, 142-149, 2016
282016
Multi-population meta-heuristics for production scheduling: A survey
D Lei, J Cai
Swarm and Evolutionary Computation 58, 100739, 2020
262020
Mobile robot path planning using improved mayfly optimization algorithm and dynamic window approach
A Zou, L Wang, W Li, J Cai, H Wang, T Tan
The Journal of Supercomputing 79 (8), 8340-8367, 2023
152023
Path planning for uav based on improved prm
W Li, L Wang, A Zou, J Cai, H He, T Tan
Energies 15 (19), 7267, 2022
142022
Multi-objective flexible job shop energy-saving scheduling problem based on improved genetic algorithm
L Wang, J Cai, X Shi
Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and …, 2017
132017
Research on mobile robot path planning by using improved genetic algorithm
L Wang, M Li, J Cai, Z Liu
Mechanical Science and Technology 36 (5), 711-716, 2017
122017
改进遗传算法在移动机器人路径规划中的应用研究
王雷, 李明, 蔡劲草, 刘志虎
机械科学与技术 36 (5), 711-716, 2017
112017
系统目前无法执行此操作,请稍后再试。
文章 1–20