A review of visual SLAM methods for autonomous driving vehicles J Cheng, L Zhang, Q Chen, X Hu, J Cai Engineering Applications of Artificial Intelligence 114, 104992, 2022 | 99 | 2022 |
Dynamic shuffled frog-leaping algorithm for distributed hybrid flow shop scheduling with multiprocessor tasks J Cai, R Zhou, D Lei Engineering Applications of Artificial Intelligence 90, 103540, 2020 | 93 | 2020 |
Two-level imperialist competitive algorithm for energy-efficient hybrid flow shop scheduling problem with relative importance of objectives M Li, D Lei, J Cai Swarm and Evolutionary Computation 49, 34-43, 2019 | 86 | 2019 |
Flexible job shop scheduling problem using an improved ant colony optimization L Wang, J Cai, M Li, Z Liu Scientific Programming 2017 (1), 9016303, 2017 | 86 | 2017 |
An imperialist competitive algorithm with memory for distributed unrelated parallel machines scheduling D Lei, Y Yuan, J Cai, D Bai International Journal of Production Research 58 (2), 597-614, 2020 | 76 | 2020 |
An improved artificial bee colony for multi-objective distributed unrelated parallel machine scheduling D Lei, Y Yuan, J Cai International Journal of Production Research 59 (17), 5259-5271, 2021 | 75 | 2021 |
An adaptive artificial bee colony with reinforcement learning for distributed three-stage assembly scheduling with maintenance J Wang, D Lei, J Cai Applied Soft Computing 117, 108371, 2022 | 69 | 2022 |
A shuffled frog-leaping algorithm with memeplex quality for bi-objective distributed scheduling in hybrid flow shop J Cai, D Lei, M Li International Journal of Production Research 59 (18), 5404-5421, 2021 | 55 | 2021 |
A novel shuffled frog-leaping algorithm with reinforcement learning for distributed assembly hybrid flow shop scheduling J Cai, D Lei, J Wang, L Wang International Journal of Production Research 61 (4), 1233-1251, 2023 | 47 | 2023 |
A cooperated shuffled frog-leaping algorithm for distributed energy-efficient hybrid flow shop scheduling with fuzzy processing time J Cai, D Lei Complex & Intelligent Systems 7 (5), 2235-2253, 2021 | 44 | 2021 |
Fuzzy distributed two-stage hybrid flow shop scheduling problem with setup time: collaborative variable search J Cai, R Zhou, D Lei Journal of intelligent & fuzzy systems 38 (3), 3189-3199, 2020 | 38 | 2020 |
A variable interval rescheduling strategy for dynamic flexible job shop scheduling problem by improved genetic algorithm L Wang, C Luo, J Cai Journal of Advanced Transportation 2017 (1), 1527858, 2017 | 36 | 2017 |
Trajectory planning of an autonomous mobile robot by evolving ant colony system L Wang, C Luo, M Li, J Cai International Journal of Robotics and Automation 32 (4), 1500-1515, 2017 | 34 | 2017 |
An adaptive multi-population genetic algorithm for job-shop scheduling problem L Wang, JC Cai, M Li Advances in Manufacturing 4, 142-149, 2016 | 28 | 2016 |
Multi-population meta-heuristics for production scheduling: A survey D Lei, J Cai Swarm and Evolutionary Computation 58, 100739, 2020 | 26 | 2020 |
Mobile robot path planning using improved mayfly optimization algorithm and dynamic window approach A Zou, L Wang, W Li, J Cai, H Wang, T Tan The Journal of Supercomputing 79 (8), 8340-8367, 2023 | 15 | 2023 |
Path planning for uav based on improved prm W Li, L Wang, A Zou, J Cai, H He, T Tan Energies 15 (19), 7267, 2022 | 14 | 2022 |
Multi-objective flexible job shop energy-saving scheduling problem based on improved genetic algorithm L Wang, J Cai, X Shi Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and …, 2017 | 13 | 2017 |
Research on mobile robot path planning by using improved genetic algorithm L Wang, M Li, J Cai, Z Liu Mechanical Science and Technology 36 (5), 711-716, 2017 | 12 | 2017 |
改进遗传算法在移动机器人路径规划中的应用研究 王雷, 李明, 蔡劲草, 刘志虎 机械科学与技术 36 (5), 711-716, 2017 | 11 | 2017 |