Deterministic job-shop scheduling: Past, present and future AS Jain, S Meeran European journal of operational research 113 (2), 390-434, 1999 | 1121 | 1999 |
Forecasting: theory and practice F Petropoulos, D Apiletti, V Assimakopoulos, MZ Babai, DK Barrow, ... International Journal of Forecasting 38 (3), 705-871, 2022 | 614 | 2022 |
A state-of-the-art review of job-shop scheduling techniques AS Jain, S Meeran Workin paper, Department of applied physics, electronic and mechanical …, 1998 | 271 | 1998 |
Automated feature recognition from 2D drawings S Meeran, MJ Pratt Computer-Aided Design 25 (1), 7-17, 1993 | 145 | 1993 |
Job-shop scheduling using neural networks AS Jain, S Meeran International Journal of production research 36 (5), 1249-1272, 1998 | 138 | 1998 |
A hybrid genetic tabu search algorithm for solving job shop scheduling problems: a case study S Meeran, MS Morshed Journal of intelligent manufacturing 23, 1063-1078, 2012 | 125 | 2012 |
New and “stronger” job-shop neighbourhoods: A focus on the method of Nowicki and Smutnicki (1996) AS Jain, B Rangaswamy, S Meeran Journal of Heuristics 6, 457-480, 2000 | 91 | 2000 |
A generic approach to recognising isolated, nested and interacting features from 2D drawings S Meeran, JM Taib Computer-Aided Design 31 (14), 891-910, 1999 | 48 | 1999 |
The challenges of pre-launch forecasting of adoption time series for new durable products P Goodwin, S Meeran, K Dyussekeneva International Journal of Forecasting 30 (4), 1082-1097, 2014 | 47 | 2014 |
The use of analogies in forecasting the annual sales of new electronics products P Goodwin, K Dyussekeneva, S Meeran IMA Journal of Management Mathematics 24 (4), 407-422, 2013 | 44 | 2013 |
Feature patterns in recognizing non-interacting and interacting primitive, circular and slanting features using a neural network AH Zulkifli, S Meeran International Journal of Production Research 37 (13), 3063-3100, 1999 | 42 | 1999 |
Recognizing features from engineering drawings without using hidden lines: a framework to link feature recognition and inspection systems S Meeran, JM Taib, MT Afzal International Journal of production research 41 (3), 465-495, 2003 | 41 | 2003 |
A multi-level hybrid framework for the deterministic job-shop scheduling problem AS Jain, S Meeran University of Dundee, 1998 | 39 | 1998 |
Active force control applied to a rigid robot arm M Mailah, JR Hewit, S Meeran Jurnal Mekanikal 2 (2), 52-68, 1996 | 37 | 1996 |
A multi-level hybrid framework applied to the general flow-shop scheduling problem AS Jain, S Meeran Computers & Operations Research 29 (13), 1873-1901, 2002 | 36 | 2002 |
Optimum path planning using convex hull and local search heuristic algorithms S Meeran, A Share Mechatronics 7 (8), 737-756, 1997 | 36 | 1997 |
Decomposition of interacting features using a Kohonen self-organizing feature map neural network AH Zulkifli, S Meeran Engineering Applications of Artificial Intelligence 12 (1), 59-78, 1999 | 30 | 1999 |
When do changes in consumer preferences make forecasts from choice-based conjoint models unreliable? S Meeran, S Jahanbin, P Goodwin, JQF Neto European Journal of Operational Research 258 (2), 512-524, 2017 | 29 | 2017 |
A framework for providing lifelong finance to the owners of affordable dwellings in the Kingdom of Saudi Arabia B Sidawi, S Meeran Cities 28 (2), 138-146, 2011 | 28 | 2011 |
Predicting the seam strength of notched webbings for parachute assemblies using the Taguchi's design of experiment and artificial neural networks L Onal, M Zeydan, M Korkmaz, S Meeran Textile Research Journal 79 (5), 468-478, 2009 | 27 | 2009 |