关注
Javier García-González
Javier García-González
Universidad Pontificia Comillas, Instituto de Investigación Tecnológica (IIT), ETSI ICAI
在 comillas.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Stochastic joint optimization of wind generation and pumped-storage units in an electricity market
J Garcia-Gonzalez, RMR de la Muela, LM Santos, AM Gonzalez
IEEE Transactions on Power Systems 23 (2), 460-468, 2008
8802008
Modeling and forecasting electricity prices with input/output hidden Markov models
AM González, AMS Roque, J García-González
IEEE Transactions on Power Systems 20 (1), 13-24, 2005
4042005
Trends and challenges in the operation of pumped-storage hydropower plants
JI Pérez-Díaz, M Chazarra, J García-González, G Cavazzini, A Stoppato
Renewable and Sustainable Energy Reviews 44, 767-784, 2015
3092015
Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market
J García-González, E Parrilla, A Mateo
European Journal of Operational Research 181 (3), 1354-1369, 2007
1832007
Integrating water and energy models for policy driven applications. A review of contemporary work and recommendations for future developments
Z Khan, P Linares, J García-González
Renewable and Sustainable Energy Reviews 67, 1123-1138, 2017
1382017
An MIP formulation for joint market-clearing of energy and reserves based on ramp scheduling
G Morales-España, A Ramos, J García-González
IEEE Transactions on Power Systems 29 (1), 476-488, 2014
1172014
Spatial and temporal synchronization of water and energy systems: Towards a single integrated optimization model for long-term resource planning
Z Khan, P Linares, M Rutten, S Parkinson, N Johnson, J García-González
Applied Energy 210, 499-517, 2018
1132018
Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming
J Garcia-Gonzalez, GA Castro
Power Tech Proceedings, 2001 IEEE Porto 3, 6 pp. vol. 3, 2001
1112001
Optimal Joint Energy and Secondary Regulation Reserve Hourly Scheduling of Variable Speed Pumped Storage Hydropower Plants
M Chazarra, JI Pérez-Díaz, J García-González
IEEE Transactions on Power Systems 33 (1), 103-115, 2018
1072018
Economic assessment of the participation of wind generation in the secondary regulation market
E Saiz-Marin, J García-González, J Barquin, E Lobato
IEEE Transactions on Power systems 27 (2), 866-874, 2012
732012
Power-capacity and ramp-capability reserves for wind integration in power-based UC
G Morales-España, R Baldick, J García-González, A Ramos
IEEE Transactions on Sustainable Energy 7 (2), 614-624, 2016
722016
Stochastic optimization model for the weekly scheduling of a hydropower system in day-ahead and secondary regulation reserve markets
M Chazarra, J García-González, JI Pérez-Díaz, M Arteseros
Electric Power Systems Research 130, 67-77, 2016
662016
Optimal Energy and Reserve Scheduling of Pumped-Storage Power Plants Considering Hydraulic Short-Circuit Operation
M Chazarra, JI Pérez-Díaz, J García-González
IEEE Transactions on Power Systems 32 (1), 344-353, 2017
612017
Improving the B&B search for large-scale hydrothermal weekly scheduling problems
E Parrilla, J García-González
International Journal of Electrical Power & Energy Systems 28 (5), 339-348, 2006
612006
Strategic bidding in deregulated power systems
J García, J Román, J Barquín, A González
13th Power Systems Computation Conference (PSCC '99). Trondheim, Norway., 1999
541999
Economic viability of pumped-storage power plants participating in the secondary regulation service
M Chazarra, JI Pérez-Díaz, J García-González, R Praus
Applied Energy 216, 224-233, 2018
502018
Optimal operation of variable speed pumped storage hydropower plants participating in secondary regulation reserve markets
M Chazarra, JI Perez-Diaz, J Garcia-Gonzalez
European Energy Market (EEM), 2014 11th International Conference on the, 1-5, 2014
502014
Under-relaxed iterative procedure for feasible short-term scheduling of a hydro chain
J Garcia-Gonzalez, E Parrilla, J Barquín, J Alonso, A Sáiz-Chicharro, ...
Power Tech Conference Proceedings, 2003 IEEE Bologna 2, 6 pp. Vol. 2, 2003
492003
Self-unit commitment of thermal units in a competitive electricity market
J Garcia-Gonzalez, J Barquin
Power Engineering Society Summer Meeting, 2000. IEEE 4, 2278-2283, 2000
492000
Impact of converter losses on the optimal power flow solution of hybrid networks based on VSC-MTDC
Q Zhao, J García-González, O Gomis-Bellmunt, E Prieto-Araujo, ...
Electric Power Systems Research 151, 395-403, 2017
462017
系统目前无法执行此操作,请稍后再试。
文章 1–20