Customer segmentation model based on value generation for marketing strategies formulation AJ Cuadros López, VE Domínguez Estudios Gerenciales 30 (130), 25-30, 2014 | 91 | 2014 |
Methodology proposal to determine project management maturity level in engineering companies AJ Cuadros López, JA Viveros Morales, AB Melendez Rojas Revista EIA 14 (27), 85-95, 2017 | 38* | 2017 |
Análisis multivariado para segmentación de clientes basada en RFM AJ Cuadros López, CG Caicedo, PCJ Oviedo Tecnura 21 (54), 41-51, 2018 | 29 | 2018 |
A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks JC Paz, D Rozenboim, A Cuadros, S Cano, JW Escobar Construction Economics and Building 18 (02), 41-69, 2018 | 21 | 2018 |
Estado De La Gerencia De Proyectos En Pymes Del Sector Artes Gráficas Y Propuestas De Lineamientos Para Su Mejoramiento (State of Project Management in SMEs of the Printing … Ó Rubiano Ovalle, A Cuadros Lopez Sotavento, 2012 | 18 | 2012 |
Modelo para evaluar la madurez en la gestión de proyectos en Pymes del sector artes gráficas AJC López, CAM Rincón, JPO Cabrera Revista Logos, Ciencia & Tecnología 10 (2), 39-56, 2018 | 12 | 2018 |
Project maturity evaluation model for SMEs from the software development sub-sector AJ Cuadros López, C Galindres, P Ruiz AD-minister, 147-162, 2016 | 7 | 2016 |
Beneficios del Tai Chi Chuan en la osteoartritis, el equilibrio y la calidad de vida P Jiménez, A Meléndez, U Albers, A López RICYDE 9 (32), 181-199, 2013 | 6 | 2013 |
Performance control considering risks for construction projects A Cuadros, C Aguilar, V Rangel Scientia et Technica 24 (02), 225-231, 2019 | 3 | 2019 |
Evaluation of the impact of schedule risks in a road infrastructure project DR Soto, LR Cadavid, A OROBIOQuiñones, A Julio, C López Evaluation 39 (47), 14, 2018 | 2 | 2018 |
Modelo de segmentação do cliente baseado na criação de valor para a formulação de estratégias de marketing AJ Cuadros, VE Domínguez Estudios Gerenciales 30 (130), 25-30, 2014 | 1 | 2014 |
Methodology for the Selection of Risk Response Actions while Considering Corporate Objectives in the Metalworking Industry ÁJ Cuadros-López, A Bustos-Useche, L Bustos-Useche Ingeniería 29 (2), e21108-e21108, 2024 | | 2024 |
Quantitative Risk Analysis for Construction Projects Considering Risks Correlations and Fuzzy Logic A Cuadros, N Cruces, C Ortiz Revista UIS Ingenierías 23 (1), 127-139, 2024 | | 2024 |
Improvement of risk management in the project scheduling of road construction projects–Case study A Cuadros, D Ramirez Procedia Computer Science 239, 767-772, 2024 | | 2024 |
Non-dominated NSGA-II genetic algorithm for schedule acceleration considering the discrete time-cost compensation problem (DTCTP) in a construction project A Cuadros, J Villota, J Velasquez Revista EIA 19 (38), 1-16, 2022 | | 2022 |
The Use of Contingency Reserves to Analyze Risk Response Actions in Project Management A Cuadros, L Rivera, A Orobio International Conference on Industrial Engineering and Operations Management …, 2019 | | 2019 |
Selection of Project Duration Forecast Method Using Earned Value Metrics A Cuadros, JP Ibarguen, L Rivera International Conference on Industrial Engineering and Operations Management …, 2018 | | 2018 |
Probabilistic Project Management Based on Earned Value Management A Cuadros, CI Aguilar, L Rangel, Lady Vanesa, Rivera International Conference on Industrial Engineering and Operations Management …, 2018 | | 2018 |
Evaluation of the Impact of Schedule Risks in a Road Infrastructure Project D Ramírez, L Rivera, A Orobio, A Cuadros Espacios 39 (47), 18, 2018 | | 2018 |
Multivariate analysis for customer segmentation based on RFM ÁJ Cuadros López, C Gonzales Caicedo, PC Jiménez Oviedo Tecnura 21 (54), 41-51, 2017 | | 2017 |