Optimasi site plan perumahan taman pondok legi VI menggunakan metode integer programming dan goal programming dengan lingo D Mahardhika, Herlina, WKF Manullang, Surani WAKTU: Jurnal Teknik UNIPA 21 (02), 2023 | 3 | 2023 |
Studi Kasus: Kelelahan dan Stress Kerja Akibat Getaran Mesin Pure Water Generator pada Perusahaan Farmasi PT. IP D Mahardhika, WKF Manullang, Surani, AF Rosyidiin Seminar Nasional Teknologi Industri 1 (1), 710-716, 2023 | 2 | 2023 |
Optimization of Spare Part Inventory for Mask Production Machines at PT. XYZ to Enhance Productivity D Mahardhika, H Murnawan J Statistika: Jurnal Ilmiah Teori dan Aplikasi Statistika 17 (2), 721-729, 2024 | | 2024 |
Distribution of Soap X in East Java Region with Bhumal Method and Traveling Salesman Problem H Murnawan, D Mahardhika J Statistika: Jurnal Ilmiah Teori dan Aplikasi Statistika 17 (1), 703-710, 2024 | | 2024 |
Advanced Analysis and Problem-Solving in the Industry: A Strategic Approach to Assisting PT. XYZ in Overcoming Operational Challenges H Murnawan, D Mahardhika WAKTU: Jurnal Teknik UNIPA 22 (02), 104-112, 2024 | | 2024 |
Analisis Aliran Proses Produksi Pagar Lipat Bengkel XYZ Steel D Mahardhika, PEDK Wati Seminar Nasional Hasil Riset dan Pengabdian 6, 1088-1893, 2024 | | 2024 |