关注
Li-Chih Wang, 王立志
Li-Chih Wang, 王立志
在 thu.edu.tw 的电子邮件经过验证
标题
引用次数
引用次数
年份
Object-oriented Petri nets for modelling and analysis of automated manufacturing systems
LC Wang
Computer Integrated Manufacturing Systems 9 (2), 111-125, 1996
1341996
A particle swarm approach for optimizing a multi-stage closed loop supply chain for the solar cell industry
YW Chen, LC Wang, A Wang, TL Chen
Robotics and Computer-Integrated Manufacturing 43, 111-123, 2017
1292017
Modeling with colored timed object-oriented Petri nets for automated manufacturing systems
LC Wang, SY Wu
Computers & industrial engineering 34 (2), 463-480, 1998
1161998
A multi-agent based agile manufacturing planning and control system
LC Wang, SK Lin
Computers & Industrial Engineering 57 (2), 620-640, 2009
912009
A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems—a case study for solar cell industry
YY Chen, CY Cheng, LC Wang, TL Chen
International Journal of Production Economics 141 (1), 66-78, 2013
612013
Framework and deployment of a cloud-based advanced planning and scheduling system
LC Wang, CC Chen, JL Liu, PC Chu
Robotics and Computer-Integrated Manufacturing 70, 102088, 2021
532021
Demand-pull replenishment model for hospital inventory management: a dynamic buffer-adjustment approach
L Wang, C Cheng, Y Tseng, Y Liu
International Journal of Production Research 53 (24), 7533-7546, 2015
502015
The development of an object-oriented Petri net cell control model
LC Wang
The International Journal of Advanced Manufacturing Technology 11, 59-69, 1996
401996
Intelligent scheduling of FMSs with inductive learning capability using neural networks
LC Wang, HM Chen, CM Liu
International Journal of Flexible Manufacturing Systems 7, 147-175, 1995
311995
Development of a cloud-based advanced planning and scheduling system for automotive parts manufacturing industry
JL Liu, LC Wang, PC Chu
Procedia Manufacturing 38, 1532-1539, 2019
282019
Development of a capacity analysis and planning simulation model for semiconductor fabrication
LC Wang, A Wang, CY Chueh
The International Journal of Advanced Manufacturing Technology 99, 37-52, 2018
252018
Distributed feedback control algorithm in an auction-based manufacturing planning and control system
LC Wang, CY Cheng, SK Lin
International Journal of Production Research 51 (9), 2667-2679, 2013
242013
Development of a cloud-based advanced planning and scheduling system
TH Hsu, LC Wang, PC Chu
Procedia manufacturing 17, 427-434, 2018
232018
Impact of capacity fluctuation on throughput performance for semiconductor wafer fabrication
LC Wang, PC Chu, SY Lin
Robotics and Computer-Integrated Manufacturing 55, 208-216, 2019
172019
A genetic algorithm for the multi-stage and parallel-machine scheduling problem with job splitting–A case study for the solar cell industry
CY Cheng, TL Chen, LC Wang, YY Chen
International Journal of Production Research 51 (16), 4755-4777, 2013
172013
A recipe parameter recommendation system for an autoclave process and an empirical study
YX Chen, LC Wang, PC Chu
Procedia manufacturing 51, 1046-1053, 2020
152020
An advanced overlapping production planning model in manufacturing supply chain
LC Wang, HL Shih
Journal of Manufacturing Technology Management 22 (7), 870-890, 2011
142011
A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry
LC Wang, YY Chen, TL Chen, CY Cheng, CW Chang
International Journal of Systems Science 45 (10), 2055-2071, 2014
122014
A RFID based agile manufacturing planning and control system
LC Wang, SK Lin, LP Huang
Rough Sets and Knowledge Technology: 4th International Conference, RSKT 2009 …, 2009
92009
A multi-granularity approach for estimating the sustainability of a factory simulation model: semiconductor packaging as an example
T Chen, LC Wang, MC Chiu
Operational Research 18 (3), 711-729, 2018
72018
系统目前无法执行此操作,请稍后再试。
文章 1–20