Object-oriented Petri nets for modelling and analysis of automated manufacturing systems LC Wang Computer Integrated Manufacturing Systems 9 (2), 111-125, 1996 | 134 | 1996 |
A particle swarm approach for optimizing a multi-stage closed loop supply chain for the solar cell industry YW Chen, LC Wang, A Wang, TL Chen Robotics and Computer-Integrated Manufacturing 43, 111-123, 2017 | 129 | 2017 |
Modeling with colored timed object-oriented Petri nets for automated manufacturing systems LC Wang, SY Wu Computers & industrial engineering 34 (2), 463-480, 1998 | 116 | 1998 |
A multi-agent based agile manufacturing planning and control system LC Wang, SK Lin Computers & Industrial Engineering 57 (2), 620-640, 2009 | 91 | 2009 |
A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems—a case study for solar cell industry YY Chen, CY Cheng, LC Wang, TL Chen International Journal of Production Economics 141 (1), 66-78, 2013 | 61 | 2013 |
Framework and deployment of a cloud-based advanced planning and scheduling system LC Wang, CC Chen, JL Liu, PC Chu Robotics and Computer-Integrated Manufacturing 70, 102088, 2021 | 53 | 2021 |
Demand-pull replenishment model for hospital inventory management: a dynamic buffer-adjustment approach L Wang, C Cheng, Y Tseng, Y Liu International Journal of Production Research 53 (24), 7533-7546, 2015 | 50 | 2015 |
The development of an object-oriented Petri net cell control model LC Wang The International Journal of Advanced Manufacturing Technology 11, 59-69, 1996 | 40 | 1996 |
Intelligent scheduling of FMSs with inductive learning capability using neural networks LC Wang, HM Chen, CM Liu International Journal of Flexible Manufacturing Systems 7, 147-175, 1995 | 31 | 1995 |
Development of a cloud-based advanced planning and scheduling system for automotive parts manufacturing industry JL Liu, LC Wang, PC Chu Procedia Manufacturing 38, 1532-1539, 2019 | 28 | 2019 |
Development of a capacity analysis and planning simulation model for semiconductor fabrication LC Wang, A Wang, CY Chueh The International Journal of Advanced Manufacturing Technology 99, 37-52, 2018 | 25 | 2018 |
Distributed feedback control algorithm in an auction-based manufacturing planning and control system LC Wang, CY Cheng, SK Lin International Journal of Production Research 51 (9), 2667-2679, 2013 | 24 | 2013 |
Development of a cloud-based advanced planning and scheduling system TH Hsu, LC Wang, PC Chu Procedia manufacturing 17, 427-434, 2018 | 23 | 2018 |
Impact of capacity fluctuation on throughput performance for semiconductor wafer fabrication LC Wang, PC Chu, SY Lin Robotics and Computer-Integrated Manufacturing 55, 208-216, 2019 | 17 | 2019 |
A genetic algorithm for the multi-stage and parallel-machine scheduling problem with job splitting–A case study for the solar cell industry CY Cheng, TL Chen, LC Wang, YY Chen International Journal of Production Research 51 (16), 4755-4777, 2013 | 17 | 2013 |
A recipe parameter recommendation system for an autoclave process and an empirical study YX Chen, LC Wang, PC Chu Procedia manufacturing 51, 1046-1053, 2020 | 15 | 2020 |
An advanced overlapping production planning model in manufacturing supply chain LC Wang, HL Shih Journal of Manufacturing Technology Management 22 (7), 870-890, 2011 | 14 | 2011 |
A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry LC Wang, YY Chen, TL Chen, CY Cheng, CW Chang International Journal of Systems Science 45 (10), 2055-2071, 2014 | 12 | 2014 |
A RFID based agile manufacturing planning and control system LC Wang, SK Lin, LP Huang Rough Sets and Knowledge Technology: 4th International Conference, RSKT 2009 …, 2009 | 9 | 2009 |
A multi-granularity approach for estimating the sustainability of a factory simulation model: semiconductor packaging as an example T Chen, LC Wang, MC Chiu Operational Research 18 (3), 711-729, 2018 | 7 | 2018 |