Construction noise management using active noise control techniques N Kwon, M Park, HS Lee, J Ahn, M Shin Journal of Construction Engineering and Management 142 (7), 04016014, 2016 | 82 | 2016 |
Covariance effect analysis of similarity measurement methods for early construction cost estimation using case-based reasoning J Ahn, M Park, HS Lee, SJ Ahn, SH Ji, K Song, BS Son Automation in Construction 81, 254-266, 2017 | 66 | 2017 |
Performance evaluation of normalization-based CBR models for improving construction cost estimation J Ahn, SH Ji, SJ Ahn, M Park, HS Lee, N Kwon, EB Lee, Y Kim Automation in Construction 119, 103329, 2020 | 53 | 2020 |
The attribute impact concept: Applications in case-based reasoning and parametric cost estimation J Ahn, SH Ji, M Park, HS Lee, S Kim, SW Suh Automation in construction 43, 195-203, 2014 | 46 | 2014 |
Energy efficiency of end-user groups for personalized HVAC control in multi-zone buildings K Song, Y Jang, M Park, HS Lee, J Ahn Energy 206, 118116, 2020 | 45 | 2020 |
Military facility cost estimation system using case-based reasoning in Korea SH Ji, M Park, HS Lee, J Ahn, N Kim, B Son Journal of Computing in Civil Engineering 25 (3), 218-231, 2011 | 44 | 2011 |
Cost estimation model using modified parameters for construction projects SH Ji, J Ahn, HS Lee, K Han Advances in Civil Engineering 2019 (1), 8290935, 2019 | 43 | 2019 |
Construction noise prediction model based on case-based reasoning in the preconstruction phase N Kwon, M Park, HS Lee, J Ahn, S Kim Journal of Construction Engineering and Management 143 (6), 04017008, 2017 | 33 | 2017 |
Development of an energy saving strategy model for retrofitting existing buildings: A Korean case study K Song, Y Ahn, J Ahn, N Kwon Energies 12 (9), 1626, 2019 | 24 | 2019 |
Probabilistic cash flow-based optimal investment timing using two-color rainbow options valuation for economic sustainability appraisement Y Kim, K Shin, J Ahn, EB Lee Sustainability 9 (10), 1781, 2017 | 20 | 2017 |
Learning method for knowledge retention in CBR cost models SH Ji, J Ahn, EB Lee, Y Kim Automation in Construction 96, 65-74, 2018 | 15 | 2018 |
Feasibility study on remodeling project by using real option model: Focusing on apartment house remodeling JH Yeon, HS Lee, M Park, S Kim, J Ahn Korean journal of construction engineering and management 15 (1), 39-50, 2014 | 11 | 2014 |
Scenario‐Planning Method for Cost Estimation Using Morphological Analysis SH Ji, J Ahn Advances in Civil Engineering 2019 (1), 4962653, 2019 | 9 | 2019 |
Quantity based active schematic estimating (Q-BASE) model BS Son, HS Lee, M Park, DY Han, J Ahn KSCE Journal of Civil Engineering 17, 9-21, 2013 | 9 | 2013 |
Reduction and transformation of energy use data for end-user group categorization in dormitory buildings K Song, J Ahn, Y Ahn, M Park, N Kwon Journal of Building Engineering 32, 101524, 2020 | 5 | 2020 |