Effects of maintenance policies on the productivity of flexible manufacturing cells M Savsar Omega 34 (3), 274-282, 2006 | 95 | 2006 |
Simulation analysis of just-in-time production systems M Savsar, A Al-Jawini International Journal of Production Economics 42 (1), 67-78, 1995 | 91 | 1995 |
Reliability analysis of a flexible manufacturing cell M Savsar Reliability Engineering & System Safety 67 (2), 147-152, 2000 | 89 | 2000 |
Modeling of machine failures in a flexible manufacturing cell with two machines served by a robot M Savsar, M Aldaihani Reliability engineering & system safety 93 (10), 1551-1562, 2008 | 78 | 2008 |
Algorithms for real-time scheduling of jobs on mixed model assembly lines A Bolat, M Savsar, MA Al-Fawzan Computers & operations research 21 (5), 487-498, 1994 | 67 | 1994 |
Simulation analysis of a pull-push system for an electronic assembly line M Savsar International Journal of production economics 51 (3), 205-214, 1997 | 55 | 1997 |
Simulation analysis of maintenance policies in just‐in‐time production systems M Savsar International Journal of Operations & Production Management 17 (3), 256-266, 1997 | 45 | 1997 |
Effects of kanban withdrawal policies and other factors on the performance of JIT systems—a simulation study M Savsar International Journal of Production Research 34 (10), 2879-2899, 1996 | 44 | 1996 |
A stochastic model for the analysis of a two-machine flexible manufacturing cell MM Aldaihani, M Savsar Computers & Industrial Engineering 49 (4), 600-610, 2005 | 43 | 2005 |
Performance analysis of an FMS operating under different failure rates and maintenance policies M Savsar International Journal of Flexible Manufacturing Systems 16, 229-249, 2004 | 43 | 2004 |
Flexible facility layout by simulation M Savsar Computers & industrial engineering 20 (1), 155-165, 1991 | 42 | 1991 |
Statistical modelling of properties of discharge pulses in electric discharge machining C Cogun, M Savsar International Journal of Machine Tools and Manufacture 30 (3), 467-474, 1990 | 34 | 1990 |
A neural network procedure for kanban allocation in JIT production control systems M Savsar, MH Choueiki International Journal of Production Research 38 (14), 3247-3265, 2000 | 31 | 2000 |
Stochastic models for reliable and unreliable flexible manufacturing cells with two machines and two robots MM Aldaihani, M Savsar International Journal of Industrial and Systems Engineering 3 (5), 610-624, 2008 | 29 | 2008 |
Two-stage production lines with a single repair crew M SAVSAR, WE BILES The International Journal of Production Research 22 (3), 499-514, 1984 | 23 | 1984 |
Modelling of multi-stage production lines with maintenance operations M Savsar* International Journal of Computer Integrated Manufacturing 21 (4), 396-406, 2008 | 21 | 2008 |
Analysis and scheduling of maintenance operations for a chain of gas stations M Savsar Journal of Industrial Engineering 2013 (1), 278546, 2013 | 20 | 2013 |
Analysis and modeling of maintenance operations in the context of an oil filling plant M Savsar Journal of Manufacturing Technology Management 22 (5), 679-697, 2011 | 20 | 2011 |
Analysis and modelling of a production line in a corrugated box factory M Savsar, C Cogun The International Journal of Production Research 32 (7), 1571-1589, 1994 | 20 | 1994 |
Effects of degraded operation modes on reliability and performance of manufacturing cells M Savsar International Journal of Industrial and Systems Engineering 1 11 (1-2), 189-204, 2012 | 19 | 2012 |