A genetic algorithm for multi-mode resource constrained project scheduling problem M Mori, CC Tseng European Journal of Operational Research 100 (1), 134-141, 1997 | 320 | 1997 |
An IPA-Kano model for classifying and diagnosing airport service attributes CC Tseng Research in transportation business & management 37, 100499, 2020 | 73 | 2020 |
The Arabidopsis thiamin‐deficient mutant pale green1 lacks thiamin monophosphate phosphatase of the vitamin B1 biosynthesis pathway WY Hsieh, JC Liao, HT Wang, TH Hung, CC Tseng, TY Chung, MH Hsieh The Plant Journal 91 (1), 145-157, 2017 | 35 | 2017 |
Two heuristic algorithms for a multi-mode resource-constrained multi-project scheduling problem CC Tseng Journal of Science and Engineering Technology 4 (2), 63-74, 2008 | 19 | 2008 |
Measuring schedule uncertainty for a stochastic resource-constrained project using scenario-based approach with utility-entropy decision model CC Tseng, PW Ko Journal of Industrial and Production Engineering 33 (8), 558-567, 2016 | 17 | 2016 |
Hybrid Taguchi-genetic algorithm for selecting and scheduling a balanced project portfolio CC Tseng, BS Liu Journal of Science and Engineering Technology 7 (1), 11-18, 2011 | 9 | 2011 |
Multiple projects scheduling with multiple modes: A genetic algorithm CC Tseng Proceedings of the 1st ORSTW Conference on Technology and Management, Taipei …, 2004 | 7 | 2004 |
A project scheduling model considering the success probability CC Tseng, M Mori, Y Yajima Proceedings on the Association of Asian Pacific Operational Research …, 1994 | 6 | 1994 |
Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics CC Tseng Journal of the Chinese Institute of Industrial Engineers 28 (3), 165-178, 2011 | 5 | 2011 |
Identifying and ranking critical success factors for implementing financial education in Taiwan elementary schools CC Tseng, TN Kou International Conference on Group Decision and Negotiation, 106-119, 2019 | 1 | 2019 |
Analysis of Scheduling Uncertainty in Stochastic Resource Constrained Networks CC Tseng, PW Ko Proceedings of the 2012 Second International Conference on Electric …, 2012 | 1 | 2012 |
An approach for identifying the most likely activity sequence in a resource-constrained stochastic network CC Tseng, PW Ko Journal of the Chinese Institute of Industrial Engineers 27 (1), 44-51, 2010 | 1 | 2010 |
以系統思考手法分析國中生數學學習動機與行為 曾清枝, 張添順 系統思考與管理 4 (2), 35-63, 2021 | | 2021 |
Evaluation and Comparison of the relative performance of projects using Weibull analysis on earned value metrics CC Tseng 23rd European Conference on Operational Research, Bonn, Germany, July 5-8 …, 2009 | | 2009 |
Identifying the Most Likely Activity Sequence in a Resource Constrained Project with Uncertain Durations CC Tseng, PW Ko Proceedings of the 18th International Conference on Flexible Automation and …, 2008 | | 2008 |
Using Weibull Analysis to evaluate different project duration forecasting methods CP Huang, CC Tseng Proceedings of the 18th International Conference on Flexible Automation and …, 2008 | | 2008 |
A genetic algorithm for multi-mode resource allocation and leveling problem JK Lin, CC Tseng 18th International Conference of, Productio-n, 2005 | | 2005 |
Selecting, Scheduling, and Balancing of R&D Project Portfolio: a Genetic Algorithm C Tseng | | |
A scenario-based approach for analyzing project scheduling risk CC Tseng, PW Ko | | |