关注
Ching Chih Tseng
Ching Chih Tseng
Department of Business Administration, Dayeh University
在 mail.dyu.edu.tw 的电子邮件经过验证
标题
引用次数
引用次数
年份
A genetic algorithm for multi-mode resource constrained project scheduling problem
M Mori, CC Tseng
European Journal of Operational Research 100 (1), 134-141, 1997
3201997
An IPA-Kano model for classifying and diagnosing airport service attributes
CC Tseng
Research in transportation business & management 37, 100499, 2020
732020
The Arabidopsis thiamin‐deficient mutant pale green1 lacks thiamin monophosphate phosphatase of the vitamin B1 biosynthesis pathway
WY Hsieh, JC Liao, HT Wang, TH Hung, CC Tseng, TY Chung, MH Hsieh
The Plant Journal 91 (1), 145-157, 2017
352017
Two heuristic algorithms for a multi-mode resource-constrained multi-project scheduling problem
CC Tseng
Journal of Science and Engineering Technology 4 (2), 63-74, 2008
192008
Measuring schedule uncertainty for a stochastic resource-constrained project using scenario-based approach with utility-entropy decision model
CC Tseng, PW Ko
Journal of Industrial and Production Engineering 33 (8), 558-567, 2016
172016
Hybrid Taguchi-genetic algorithm for selecting and scheduling a balanced project portfolio
CC Tseng, BS Liu
Journal of Science and Engineering Technology 7 (1), 11-18, 2011
92011
Multiple projects scheduling with multiple modes: A genetic algorithm
CC Tseng
Proceedings of the 1st ORSTW Conference on Technology and Management, Taipei …, 2004
72004
A project scheduling model considering the success probability
CC Tseng, M Mori, Y Yajima
Proceedings on the Association of Asian Pacific Operational Research …, 1994
61994
Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics
CC Tseng
Journal of the Chinese Institute of Industrial Engineers 28 (3), 165-178, 2011
52011
Identifying and ranking critical success factors for implementing financial education in Taiwan elementary schools
CC Tseng, TN Kou
International Conference on Group Decision and Negotiation, 106-119, 2019
12019
Analysis of Scheduling Uncertainty in Stochastic Resource Constrained Networks
CC Tseng, PW Ko
Proceedings of the 2012 Second International Conference on Electric …, 2012
12012
An approach for identifying the most likely activity sequence in a resource-constrained stochastic network
CC Tseng, PW Ko
Journal of the Chinese Institute of Industrial Engineers 27 (1), 44-51, 2010
12010
以系統思考手法分析國中生數學學習動機與行為
曾清枝, 張添順
系統思考與管理 4 (2), 35-63, 2021
2021
Evaluation and Comparison of the relative performance of projects using Weibull analysis on earned value metrics
CC Tseng
23rd European Conference on Operational Research, Bonn, Germany, July 5-8 …, 2009
2009
Identifying the Most Likely Activity Sequence in a Resource Constrained Project with Uncertain Durations
CC Tseng, PW Ko
Proceedings of the 18th International Conference on Flexible Automation and …, 2008
2008
Using Weibull Analysis to evaluate different project duration forecasting methods
CP Huang, CC Tseng
Proceedings of the 18th International Conference on Flexible Automation and …, 2008
2008
A genetic algorithm for multi-mode resource allocation and leveling problem
JK Lin, CC Tseng
18th International Conference of, Productio-n, 2005
2005
Selecting, Scheduling, and Balancing of R&D Project Portfolio: a Genetic Algorithm
C Tseng
A scenario-based approach for analyzing project scheduling risk
CC Tseng, PW Ko
系统目前无法执行此操作,请稍后再试。
文章 1–19