Challenges for integrated design and delivery solutions R Owen, R Amor, M Palmer, J Dickinson, CB Tatum, AS Kazi, M Prins, ... Architectural Engineering and Design Management 6 (4), 232-240, 2010 | 165 | 2010 |
Integrated Design & Delivery Solutions R Owen, M Palmer, J Dickinson, B Tatum, AS Kazi, R Amor, M Prins CIB White Paper on IDDS, CIB Publication 328, 2009 | 153* | 2009 |
Conceptual framework for potential implementations of multi criteria decision making (MCDM) methods for design quality assessment T Harputlugil, M Prins, AT Gültekin, YI Topçu Management and Innovation for a Sustainable Built Environment MISBE 2011 …, 2011 | 92 | 2011 |
Design Management Within the Digital Design Team A Otter, M Prins ECAM, july, 162-173, 2002 | 61* | 2002 |
Architectural management: international research and practice S Emmitt, M Prins, A den Otter John Wiley & Sons, 2009 | 52 | 2009 |
Architectural design quality assessment based on analytic hierarchy process: A case study T Harputlugil, AT Gültekin, M Prins, Yİ Topçu METU Journal of the Faculty of Architecture 31 (2), 2016 | 48 | 2016 |
Circular economy and real estate: the legal (im) possibilities of operational lease H Ploeger, M Prins, A Straub, R Van den Brink Facilities 37 (9/10), 653-668, 2019 | 24 | 2019 |
Exploring the possibilities of correlating management with value in architectural design L Volker, M Prins 'special meeting'on designing value: new directions in architectural …, 2005 | 23 | 2005 |
Façade leasing: drivers and barriers to the delivery of integrated façades-as-a-service JA Aguerre, T Klein, A den Heijer, R Vrijhoef, H Ploeger, M Prins Real Estate Research Quarterly 17 (3), 11-22, 2018 | 21 | 2018 |
Chapter One Architectural Value M Prins Architectural Management: International Research and Practice, 3, 2009 | 20* | 2009 |
Radical circular economy M Prins, S Mohammadi, N Slob Proceedings of the CIB joint international symposium-Going north for …, 2015 | 16 | 2015 |
Collaborative architectural design management R Sebastian, M Prins Architectural Management, 2009 | 15 | 2009 |
FLEX 3.0: an instrument to formulate the demand for and assessing the supply of the adaptive capacity of buildings RP Geraedts, M Prins CIB World Building Congress WBC2016. N. Achour. Tampere, Tampere University …, 2016 | 13 | 2016 |
BIM at small architectural firms B Leeuwis, M Prins, A Pastoors 19th CIB World Building Congress-Construction and Society, 2013 | 13 | 2013 |
Semiotic based facetted classification to support browsing architectural contents in MACE V Spigai, M Condotta, E Dalla Vecchia, T Nagel Performance and Knowledge Management: proceedings of joint CIB Conference …, 2008 | 12 | 2008 |
The CE Meter: An instrument to assess the circular economy capacity of buildings RP Geraedts, M Prins Proceedings of the CIB joint international symposium-Going north for …, 2015 | 11 | 2015 |
Innovative solutions in Dutch DBFMO projects A Straub, M Prins, R Hansen Architecture Science 5 (6), 49-66, 2012 | 11 | 2012 |
Briefing: static or dynamic? M Prins, J Koolwijk, L Volker, JMF Wamelink Proceedings of the joint CIB, Tensinet, IASS International Conference on …, 2006 | 11 | 2006 |
Fast-tracking by high perfomance Design Teams F Otter, M Prins Perfomance in Product and Practice (CD-rom), # 1-# 12, 2001 | 11 | 2001 |
Flexibiliteit en kosten in het ontwerpproces: een besluitvormingondersteunend model M Prins | 11 | 1992 |