关注
Sawan Shetty
标题
引用次数
引用次数
年份
Development of a new flexible nanogenerator from electrospun nanofabric based on PVDF/talc nanosheet composites
S Shetty, A Mahendran, S Anandhan
Soft Matter 16 (24), 5679-5688, 2020
412020
Estimation of power and efficiency of hydraulic ram pump with Re-circulation system
SS Sampath, S Shetty, AM Pendanathu, W Javaid, MCP Selvan
International Journal of Computer-aided Mechanical Design and Implementation …, 2015
222015
Wear estimation at the contact surfaces of oval shaped hip implants using finite element analysis
N Shaikh, S Shenoy B, S Bhat N, S Shetty, C KN
Cogent Engineering 10 (1), 2222985, 2023
182023
Experimental and finite element analysis on chip formation mechanism in machining of elastomers
R Nayak, R Shetty, S Shetty
Bonfring International Journal of Industrial Engineering and Management …, 2012
142012
Polymorphism, dielectric and piezoelectric response of organo-modified Ni–Co layered double hydroxide nanosheets dispersed electrospun PVDF nanofabrics
S Shetty, GS Ekbote, A Mahendran, S Anandhan
Journal of Materials Science: Materials in Electronics 30 (23), 20703-20715, 2019
122019
Fatigue life evaluation of different hip implant designs using finite element analysis
JV Corda, KN Chethan, S Shenoy, S Shetty, M Zuber
Journal of Applied Engineering Science 21 (3), 896-907, 2023
102023
Influence of packing configuration and flow rate on the performance of a forced draft wet cooling tower
SS Salins, S Kumar, AT González, S Shetty
Journal of Building Engineering 72, 106615, 2023
92023
Physico-chemical and piezoelectric characterization of electroactive nanofabrics based on functionalized graphene/talc nanolayers/PVDF for energy harvesting
S Shetty, AM Shanmugharaj, S Anandhan
Journal of Polymer Research 28 (11), 419, 2021
82021
Improvement of power output from solar panel using water cooling system
AA Sequeira, S Shetty, SS Sampath, M Chithirai
Global Journal of Advanced Engineering Technologies 5 (1), 58-63, 2016
72016
Primary spinal paragangliomas: a clinicopathological and immunohistochemical study of six cases.
M Rumana, V Santosh, N Khursheed, TC Yasha, VR Kolluri, S Shetty, ...
Indian Journal of Pathology and Microbiology 50 (3), 528-532, 2007
72007
Finite element analysis of elliptical shaped stem profile of hip prosthesis using dynamic loading conditions
JV Corda, KN Chethan, S Shetty, S Shenoy, M Zuber
Biomedical Physics & Engineering Express 9 (6), 065028, 2023
62023
Investigation of abrasive waterjet cutting surfaces of alumina ceramics
MCP Selvan, SS Sampath, S Shetty, B Shivamurthy
Int J Emerg Technol Adv Eng 5 (1), 402-407, 2015
62015
Determination of power in hydroelectric plant driven by hydram: A perpetual motion machine type 1
SS Salins, S Shetty, S Siddiqui
International Journal of Multidisciplinary Research and Modern Education …, 2015
52015
Estimation of power and mechanical efficiency of compressed air powered quad bike
S Shetty, SS Sampath, MM Sharafat, CPM Selvan
American International Journal of Research in Science, Technology …, 2015
42015
Estimation of power in low velocity vertical axis wind turbine. Frontiers of Mechanical Engineering
SS Sampath, S Shetty, MCP Selvan
vol 10, 211-218, 2015
4*2015
Optimization of Process Parameters in Abrasive Water Jet Drilling ofD2 Steel to Produce Minimum Surface Roughness Using Taguchi Approach
D Deepak, D Anjaiah, S Shetty
32017
Investigation of cutting force in elastomer machining under ambient and cryogenic conditions using response surface methodology
R Nayak, R Shetty, S Shetty
32014
DOE coupled MLP-ANN for optimization of thrust force and torque during drilling of CCFRP composite laminates
S Shetty, R Shetty, R Nayak, A Hegde, UK Shetty SV
Cogent Engineering 11 (1), 2319397, 2024
22024
Experimental analysis of stresses in weld metal subjected to tensile load
S SS, N Rammohan, R Shetty, S Shetty
World Journal of Engineering 13 (4), 281-287, 2016
22016
Vibration Analysis of Hollow Sectioned Curved Beam Using Finite Element Method
SS Sampath, S Shetty
European Journal of Advances in Engineering and Technology 2 (2), 1-5, 2015
22015
系统目前无法执行此操作,请稍后再试。
文章 1–20