Operations management issues in design and control of hybrid human-robot collaborative manufacturing systems: a survey SE Hashemi-Petroodi, S Thevenin, S Kovalev, A Dolgui Annual Reviews in Control 49, 264-276, 2020 | 105 | 2020 |
Workforce reconfiguration strategies in manufacturing systems: a state of the art SE Hashemi-Petroodi, A Dolgui, S Kovalev, MY Kovalyov, S Thevenin International Journal of Production Research 59 (22), 6721-6744, 2021 | 85 | 2021 |
Material Requirements Planning Under Demand Uncertainty Using Stochastic Optimization S Thevenin, Y Adulyasak, JF Cordeau Production and Operations Management, 2021 | 58 | 2021 |
Sustainable and energy efficient reconfigurable manufacturing systems O Battaïa, L Benyoucef, X Delorme, A Dolgui, S Thevenin Reconfigurable Manufacturing Systems: From Design to Implementation, 179-191, 2020 | 46 | 2020 |
Metaheuristics for a scheduling problem with rejection and tardiness penalties S Thevenin, N Zufferey, M Widmer Journal of scheduling 18, 89-105, 2015 | 46 | 2015 |
Learning variable neighborhood search for a scheduling problem with time windows and rejections S Thevenin, N Zufferey Discrete Applied Mathematics 261, 344-353, 2019 | 45 | 2019 |
The ASSISTANT project: AI for high level decisions in manufacturing G Castañé, A Dolgui, N Kousi, B Meyers, S Thevenin, E Vyhmeister, ... International Journal of Production Research 61 (7), 2288-2306, 2023 | 43 | 2023 |
Order acceptance and scheduling with earliness and tardiness penalties S Thevenin, N Zufferey, M Widmer Journal of Heuristics 22, 849-890, 2016 | 43 | 2016 |
Graph multi-coloring for a job scheduling application S Thevenin, N Zufferey, JY Potvin Discrete Applied Mathematics, 2016 | 37 | 2016 |
Makespan minimisation for a parallel machine scheduling problem with preemption and job incompatibility S Thevenin, N Zufferey, JY Potvin International Journal of Production Research 55 (6), 1588-1606, 2017 | 34 | 2017 |
A state-of-the-art on production planning in Industry 4.0 D Luo, S Thevenin, A Dolgui International Journal of Production Research 61 (19), 6602-6632, 2023 | 31 | 2023 |
Robust optimization approaches for purchase planning with supplier selection under lead time uncertainty S Thevenin, O Ben-Ammar, N Brahimi European Journal of Operational Research 303 (3), 1199-1215, 2022 | 30 | 2022 |
Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times I Slama, O Ben-Ammar, S Thevenin, A Dolgui, F Masmoudi European Journal of Operational Research 303 (3), 1183-1198, 2022 | 18 | 2022 |
Model and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisions S Thevenin, N Zufferey, R Glardon Annals of Operations Research 259, 437-460, 2017 | 17 | 2017 |
Stochastic dual dynamic programming for multiechelon lot sizing with component substitution S Thevenin, Y Adulyasak, JF Cordeau INFORMS Journal on Computing 34 (6), 3151-3169, 2022 | 16 | 2022 |
Workforce planning and assignment in mixed-model assembly lines as a factor of line reconfigurability: state of the art A Dolgui, SEH Petroodi, S Kovalev, MY Kovalyov, S Thevenin IFAC-PapersOnLine 52 (13), 2746-2751, 2019 | 16 | 2019 |
Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers SE Hashemi-Petroodi, S Thevenin, S Kovalev, A Dolgui Omega 113, 102688, 2022 | 14 | 2022 |
Robust optimization for lot-sizing problems under yield uncertainty P Metzker, S Thevenin, Y Adulyasak, A Dolgui Computers & Operations Research 149, 106025, 2023 | 12 | 2023 |
Fair-split distribution of multi-dose vaccines with prioritized age groups and dynamic demand: The case study of COVID-19 B Vahdani, M Mohammadi, S Thevenin, M Gendreau, A Dolgui, P Meyer European Journal of Operational Research 310 (3), 1249-1272, 2023 | 10 | 2023 |
A skill-and feature-based approach to planning process monitoring in assembly planning C Gonnermann, SE Hashemi-Petroodi, S Thevenin, A Dolgui, R Daub The International Journal of Advanced Manufacturing Technology 122 (5), 2645 …, 2022 | 10 | 2022 |