The capacitated lot sizing problem: a review of models and algorithms B Karimi, SMTF Ghomi, JM Wilson Omega 31 (5), 365-378, 2003 | 1006 | 2003 |
Long -Term Open Pit Mine Production Planning : A Review of Models and Algorithms M Osanloo, J nejad, b. karimi International Journal of Mining Reclamation and Environment, 2007 | 256 | 2007 |
Reverse logistics network design using simulated annealing MS Pishvaee, K Kianfar, B Karimi The International Journal of Advanced Manufacturing Technology 47, 269-281, 2010 | 246 | 2010 |
Deriving preference order of open pit mines equipment through MADM methods: Application of modified VIKOR method AA Bazzazi, M Osanloo, B Karimi Expert Systems with Applications 38 (3), 2550-2556, 2011 | 220 | 2011 |
A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes AH Kashan, B Karimi, M Jenabi Computers & Operations Research 35 (4), 1084-1098, 2008 | 196 | 2008 |
A discrete particle swarm optimization algorithm for scheduling parallel machines AH Kashan, B Karimi Computers & Industrial Engineering 56 (1), 216-223, 2009 | 180 | 2009 |
Multi-objective green supply chain optimization with a new hybrid memetic algorithm using the Taguchi method R Jamshidi, SMTF Ghomi, B Karimi Scientia Iranica 19 (6), 1876-1886, 2012 | 178 | 2012 |
Closed-loop supply chain network design under a fuzzy environment M Ramezani, AM Kimiagari, B Karimi, TH Hejazi Knowledge-Based Systems 59, 108-120, 2014 | 167 | 2014 |
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains SA Torabi, SMTF Ghomi, B Karimi European Journal of Operational Research 173 (1), 173-189, 2006 | 156 | 2006 |
Particle swarm algorithm for solving systems of nonlinear equations M Jaberipour, E Khorram, B Karimi Computers & Mathematics with Applications 62 (2), 566-576, 2011 | 139 | 2011 |
Closed-loop supply chain network design: A financial approach M Ramezani, AM Kimiagari, B Karimi Applied Mathematical Modelling 38 (15-16), 4099-4119, 2014 | 131 | 2014 |
Multi-period sustainable and integrated recycling network for municipal solid waste–A case study in Tehran AM Harijani, S Mansour, B Karimi, CG Lee Journal of cleaner production 151, 96-108, 2017 | 130 | 2017 |
Optimizing the pricing and replenishment policy for non-instantaneous deteriorating items with stochastic demand and promotional efforts R Maihami, B Karimi Computers & Operations Research 51, 302-312, 2014 | 119 | 2014 |
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates M Ebrahimi, SMTF Ghomi, B Karimi Applied mathematical modelling 38 (9-10), 2490-2504, 2014 | 118 | 2014 |
Manufacturer–retailer supply chain coordination: A bi-level programming approach AN Sadigh, M Mozafari, B Karimi Advances in Engineering Software 45 (1), 144-152, 2012 | 113 | 2012 |
Effective hybrid genetic algorithm for minimizing makespan on a single-batch-processing machine with non-identical job sizes AH Kashan, B Karimi, F Jolai International Journal of Production Research 44 (12), 2337-2360, 2006 | 110 | 2006 |
To Develop a Third Party Reverse Logistics Network for End-of-Life Vehicles in Iran M mahmodzad, s. mansour, b. karimi RESOURCES CONSERVATION AND RECYCLING 78 (0921-3449), 1-14, 2013 | 105 | 2013 |
Designing a reverse logistics network for end-of-life vehicles recovery. M Zarei, S Mansour, AH Kashan, B Karimi Mathematical Problems in Engineering 2010, 2010 | 97 | 2010 |
Vehicle routing scheduling problem with cross docking and split deliveries SS Moghadam, SMTF Ghomi, B Karimi Computers & chemical engineering 69, 98-107, 2014 | 95 | 2014 |
Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups M Mohammadi, SMT Fatemi Ghomi, B Karimi, SA Torabi Journal of Intelligent Manufacturing 21, 501-510, 2010 | 95 | 2010 |