关注
Gongfan Chen
标题
引用次数
引用次数
年份
Using Images to Detect, Plan, Analyze, and Coordinate a Smart Contract in Construction
G Chen, M Liu, YX Zhang, ZG Wang, S Hsiang, C He
Journal of Management in Engineering 39 (2), 04023002, 2023
192023
Exploit social distancing in construction scheduling: Visualize and optimize space–time–workforce tradeoff
C He, M Liu, YX Zhang, Z Wang, SM Hsiang, G Chen, J Chen
Journal of Management in Engineering 38 (4), 04022027, 2022
132022
Space–time–workforce visualization and conditional capacity synthesis in uncertainty
C He, M Liu, Y Zhang, Z Wang, SM Hsiang, G Chen, W Li, G Dai
Journal of Management in Engineering 39 (2), 04022071, 2023
112023
Motivating reliable collaboration for modular construction: Shapley value–based smart contract
G Chen, M Liu, H Li, SM Hsiang, A Jarvamard
Journal of Management in Engineering 39 (6), 04023042, 2023
102023
Knowing what is going on–a smart contract for modular construction
G Chen, H Li, M Liu, SM Hsiang, A Jarvamardi
Canadian Journal of Civil Engineering, 2022
82022
Situation Awareness Based Smart Contract for Modular Construction
H Li, G Chen, M Liu, SM Hsiang, A Jarvamardi
Canadian Society of Civil Engineering Annual Conference, 363-373, 2023
62023
A mechanism for smart contracts to mediate production bottlenecks under constraints
G Chen, C He, S Hsiang, M Liu, H Li
Proc., 31st Annual Conf. of the Int. Group for Lean Construction (IGLC …, 2023
52023
Facilitating Smart Contract in Project Scheduling under Uncertainty—A Choquet Integral Approach
C He, M Liu, Z Wang, G Chen, Y Zhang, SM Hsiang
Construction Research Congress 2022, 930-939, 2022
52022
Enhance Collaboration Reliability at Task Level for Construction Projects Using Blockchain Technology.
G Chen
North Carolina State University, 2023
2023
系统目前无法执行此操作,请稍后再试。
文章 1–9