A comparison of heuristics and relaxations for the capacitated plant location problem G Cornuéjols, R Sridharan, JM Thizy European journal of operational research 50 (3), 280-297, 1991 | 397 | 1991 |
Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system V Vinod, R Sridharan International Journal of Production Economics 129 (1), 127-146, 2011 | 206 | 2011 |
Corneal response to short-term orthokeratology lens wear R Sridharan, H Swarbrick Optometry and vision science 80 (3), 200-206, 2003 | 175 | 2003 |
Design and development of a hybrid ant colony-variable neighbourhood search algorithm for a multi-depot green vehicle routing problem E Jabir, VV Panicker, R Sridharan Transportation Research Part D: Transport and Environment 57, 422-457, 2017 | 131 | 2017 |
Scheduling a dynamic job shop production system with sequence-dependent setups: an experimental study V Vinod, R Sridharan Robotics and Computer-Integrated Manufacturing 24 (3), 435-449, 2008 | 112 | 2008 |
Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis V Vinod, R Sridharan The International Journal of Advanced Manufacturing Technology 36, 355-372, 2008 | 95 | 2008 |
Multi-objective optimization model for a green vehicle routing problem E Jabir, VV Panicker, R Sridharan Procedia-Social and Behavioral Sciences 189, 33-39, 2015 | 83 | 2015 |
Educational data mining for predicting students’ academic performance using machine learning algorithms P Dabhade, R Agarwal, KP Alameen, AT Fathima, R Sridharan, ... Materials Today: Proceedings 47, 5260-5267, 2021 | 82 | 2021 |
Multi-period reverse logistics network design for used refrigerators ST John, R Sridharan, PNR Kumar, M Krishnamoorthy Applied Mathematical Modelling 54, 311-331, 2018 | 80 | 2018 |
Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times V Vinod, R Sridharan International Journal of Production Research 47 (6), 1425-1447, 2009 | 78 | 2009 |
Simulation modelling and analysis of part and tool flow control decisions in a flexible manufacturing system NS Kumar, R Sridharan Robotics and Computer-Integrated Manufacturing 25 (4-5), 829-838, 2009 | 70 | 2009 |
Evaluation of routing flexibility of a flexible manufacturing system using simulation modelling and analysis OA Joseph, R Sridharan The International Journal of Advanced Manufacturing Technology 56, 273-289, 2011 | 66 | 2011 |
Analyzing the interactions among barriers of sustainable supply chain management practices: A case study AE Narayanan, R Sridharan, PN Ram Kumar Journal of Manufacturing Technology Management 30 (6), 937-971, 2019 | 64 | 2019 |
Reverse logistics network design: a case of mobile phones and digital cameras ST John, R Sridharan, PN Ram Kumar The International Journal of Advanced Manufacturing Technology 94, 615-631, 2018 | 64 | 2018 |
Green supply chain management practice adoption in Ugandan SME manufacturing firms: The role of enviropreneurial orientation S Namagembe, R Sridharan, S Ryan World Journal of Science, Technology and Sustainable Development 13 (3), 154-173, 2016 | 61 | 2016 |
Supply chain risk management: models and methods CR Vishnu, R Sridharan, PNR Kumar International Journal of Management and Decision Making 18 (1), 31-75, 2019 | 59 | 2019 |
Effects of routing flexibility, sequencing flexibility and scheduling decision rules on the performance of a flexible manufacturing system OA Joseph, R Sridharan The International Journal of Advanced Manufacturing Technology 56, 291-306, 2011 | 57 | 2011 |
Ant colony optimisation algorithm for distribution-allocation problem in a two-stage supply chain with a fixed transportation charge VV Panicker, R Vanga, R Sridharan International journal of production research 51 (3), 698-717, 2013 | 51 | 2013 |
Analysis of dynamic due-date assignment models in a flexible manufacturing system OA Joseph, R Sridharan Journal of Manufacturing Systems 30 (1), 28-40, 2011 | 48 | 2011 |
A hybrid neural network–genetic algorithm approach for permutation flow shop scheduling A Noorul Haq, TR Ramanan, KS Shashikant, R Sridharan International Journal of Production Research 48 (14), 4217-4231, 2010 | 48 | 2010 |