关注
Dr. Cut Zukhrina Oktaviani, S.T., M.T.
Dr. Cut Zukhrina Oktaviani, S.T., M.T.
Department of Civil Engineering, Faculty of Engineering, Syiah Kuala University
在 usk.ac.id 的电子邮件经过验证
标题
引用次数
引用次数
年份
Analisis Korelasi Faktor Komunikasi Proyek Terhadap Pencapaian Kinerja Waktu di Kota Banda Aceh
R Mareno, CZ Oktaviani, S Husin
Jurnal Arsip Rekayasa Sipil dan Perencanaan 5 (1), 38-46, 2022
72022
Proporsi Biaya Sumber Daya Manusia, Material Dan Alat Pada Proyek Konstruksi Jalan
B Mufardis, CZ Oktaviani, B Buraida
Journal of The Civil Engineering Student 3 (2), 127-133, 2021
62021
Kajian Kinerja Supply Chain pada Proyek Konstruksi Bangunan Gedung
CZ Oktaviani
Master Theses from JBPTITBPP, Central Library Institute Technology Bandung …, 2008
62008
Maturity of procurement units for public construction projects in Indonesia
M Abduh, SN Sukardi, RD Wirahadikusumah, CZ Oktaviani, SN Bahagia
International Journal of Construction Management 23 (13), 2171-2184, 2023
52023
Hubungan Antara Kualitas Pengadaan Pekerjaan Konstruksi Pemerintah Dengan Kualitas Infrastruktur Indonesia
CZ Oktaviani
Universitas Muhammadiyah Surakarta, 2015
52015
Percepatan Waktu Pelaksanaan Pekerjaan Konstruksi Dengan Metode Cpm Dan Tcto
CZ Oktaviani, IA Majid, R Risdiawati
Inersia: Jurnal Teknik Sipil 11 (1), 33-40, 2019
42019
Komposisi Biaya Sumber Daya Material dan Tenaga Kerja Pada Proyek Konstruksi Bangunan Gedung Sederhana
RA Hawari, CZ Oktaviani, N Nurisra
Journal of The Civil Engineering Student 3 (2), 148-154, 2021
32021
Upaya Peningkatan Efektivitas Dan Efisiensi Rantai Pasok Proyek Konstruksi Dengan Pengukuran Kinerja
CZ Oktaviani
Tameh 8 (2), 73-79, 2019
32019
Metode Just In Time (JIT) Dalam Pengelolaan Persediaan Pada Pelaksanaan Proyek Konstruksi
CZ Oktaviani, F Maulina
Inersia: Jurnal Teknik Sipil 2 (2), 27-35, 2011
32011
Pengaruh Keterlambatan Proses Pengadaan Tanah terhadap Pencapaian Waktu Proyek
MA Nugraha, CZ Oktaviani, AT Bulba
Jurnal Arsip Rekayasa Sipil dan Perencanaan 5 (1), 59-68, 2022
22022
Penentuan Nilai Mark-up Penawaran Kontraktor Dengan Model Friedman
CZ Oktaviani, C Mutiawati, N Maulisa
Portal: Jurnal Teknik Sipil 10 (2), 7-11, 2018
22018
Identifikasi Faktor Pendukung Dan Penghambat Adopsi Bim Oleh Kontraktor Di Provinsi Aceh
H Zhafirah, CZ Oktaviani, F Maulina
Jurnal Rekayasa Sipil 19 (1), 54-63, 2023
12023
Faktor Keterlambatan Proses Pengadaan Tanah Terhadap Pencapaian Kinerja Proyek Strategis Nasional (PSN) Jaringan Irigasi Aceh
T Jurnal
12023
Kinerja Operasi dan Pemeliharaan Bendungan Keuliling Kabupaten Aceh Besar
M Bravikawati, CZ Oktaviani, M Fauzi
Jurnal Arsip Rekayasa Sipil dan Perencanaan 5 (4), 337-345, 2022
12022
Principal Component Analysis Application for Determining Factors Influencing Drainage Construction Process in Residential Areas
Y Amalia, E Fatimah, CZ Oktaviani
Journal of Physics: Conference Series 2394 (1), 012042, 2022
12022
Hotel Building Reliability Towards Building Age
S Indrawansyah, A Abdullah, CZ Oktaviani
Elkawnie: Journal of Islamic Science and Technology 6 (2), 201-212, 2020
12020
Kajian Kompleksitas Proyek Konstruksi: Tinjauan Kegiatan Pengadaan Pekerjaan Konstruksi di Indonesia
CZ Oktaviani
Menara: Jurnal Teknik Sipil 13 (1), 35-45, 2018
12018
Analysis of User Satisfaction Index of Clean Water Providers by PDAM in Bireuen Regency
M Alghifari, CZ Oktaviani, E Fatimah
Proceeding of the International Conference on Multidisciplinary Research for …, 2024
2024
The Relationship of Drivers to Implementation of Sustainable Procurement in Aceh
R Maulana, CZ Oktaviani, AT Bulba
Proceeding of the International Conference on Multidisciplinary Research for …, 2024
2024
Multiple Regression Analysis to The Influence of Communication Management on Project Success
DR Ibdayanti, CZ Oktaviani, S Husin
E3S Web of Conferences 476, 01001, 2024
2024
系统目前无法执行此操作,请稍后再试。
文章 1–20