Near optimum selection of module configuration for efficient modular construction T Salama, A Salah, O Moselhi, M Al-Hussein Automation in construction 83, 316-329, 2017 | 125 | 2017 |
Contingency modelling for construction projects using fuzzy-set theory A Salah, O Moselhi Engineering, Construction and Architectural Management 22 (2), 214-241, 2015 | 96 | 2015 |
Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory A Salah, O Moselhi Canadian Journal of Civil Engineering 43 (5), 429-442, 2016 | 66 | 2016 |
Integrating critical chain project management with last planner system for linear scheduling of modular construction T Salama, A Salah, O Moselhi Construction innovation 21 (4), 525-554, 2021 | 31 | 2021 |
Integration of linear scheduling method and the critical chain project management T Salama, A Salah, O Moselhi Canadian Journal of Civil Engineering 45 (1), 30-40, 2018 | 26 | 2018 |
Integration of offsite and onsite schedules in modular construction T Salama, A Salah, O Moselhi ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2017 | 21 | 2017 |
Study of factors influencing productivity of hauling equipment in earthmoving projects using fuzzy set theory A Salem, A Salah, M Ibrahim, O Moselhi International Journal of Innovation, Management and Technology 8 (2), 151, 2017 | 19 | 2017 |
Overview of fuzzy hybrid techniques in construction engineering and management NG Seresht, R Lourenzutti, A Salah, AR Fayek Fuzzy hybrid computing in construction engineering and management: Theory …, 2018 | 17 | 2018 |
Configuration of hybrid modular construction for residential buildings T Salama, A Salah, O Moselhi International Journal of Innovation, Management and Technology 8 (2), 106-112, 2017 | 15 | 2017 |
Fuzzy set-based risk management for construction projects A Salah Concordia University, 2015 | 14 | 2015 |
Fuzzy set-based contingency estimating and management O Moselhi, A Salah ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2012 | 13 | 2012 |
Alternative scheduling and planning processes for hybrid offsite construction T Salama, A Salah, O Moselhi ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2016 | 12 | 2016 |
Fuzzy Set-Based Contingency Estimating and Management A Salah Concordia University, 2012 | 11 | 2012 |
Fuzzy-based configuration of automated data acquisition systems for earthmoving operations. A Salem, A Salah, O Moselhi J. Inf. Technol. Constr. 23, 122-137, 2018 | 7 | 2018 |
Automated fuzzy set-based system for monitoring the effects of productivity variation on earthmoving projects A Salah, A Salem, O Moselhi International Journal of Innovation, Management and Technology 8 (2), 85, 2017 | 5 | 2017 |
Estimating post-and pre-mitigation contingency in construction A Salah, O Moselhi Risk Analysis 9, 243, 2014 | 5 | 2014 |
Quantitative and qualitative risk in EPCM projects using fuzzy set theory A Salah, O Moselhi 2013 Joint IFSA World Congress and NAFIPS Annual Meeting (IFSA/NAFIPS), 1177 …, 2013 | 3 | 2013 |
INTEGRATED SCHEDULING OF MODULAR CONSTRUCTION USING “MOD-SCHEDULER” T Salama, A Salah, O Moselhi Proceedings of the 7th International Canadian Society for Civil Engineering …, 2019 | 1 | 2019 |
Risk Mitigation for EPCM projects A Salah, O Moselhi Annual Conference of the Canadian Society for Civil Engineering 2014 …, 2015 | 1 | 2015 |
Analysis of Factors Affecting the Performance of Dynamic Compaction Technique: A Study of Coastal Area of Eastern Province in Saudi Arabia A Salah, M Sodangi, ES Derdas, JN Al Nasser, AA Alshehri Qatar University Press, 2023 | | 2023 |