Joint optimization of jobs sequence and inspection policy for a single system with two-stage failure process S Taghipour, S Azimpoor IEEE Transactions on Reliability 67 (1), 156-169, 2018 | 35 | 2018 |
Joint planning of production and inspection of parallel machines with two-phase of failure S Azimpoor, S Taghipour, B Farmanesh, M Sharifi Reliability Engineering & System Safety 217, 108097, 2022 | 24 | 2022 |
Joint inspection and product quality optimization for a system with delayed failure S Azimpoor, S Taghipour Reliability Engineering & System Safety 215, 107793, 2021 | 18 | 2021 |
Optimal job scheduling and inspection of a machine with delayed failure S Azimpoor, S Taghipour International Journal of Production Research 58 (21), 6453-6473, 2020 | 16 | 2020 |
Joint Planning of Production and Inspection of Parallel Machines with Two-phase of Failure MS S Azimpoor, S Taghipour (Associate Professor), B Farmanesh Reliability Engineering & System Safety 217, 2021 | | 2021 |
Integrated Production, Quality and Inspection Optimization Models for Production Systems with Delayed Failure S Azimpoor Toronto Metropolitan University, 2021 | | 2021 |
A Branch and Bound Algorithm for Single Machine Scheduling with Two Stages of Failure Process S Azimpoor, S Taghipour 2020 Annual Reliability and Maintainability Symposium (RAMS), 1-8, 2020 | | 2020 |