关注
Hanie Teki Tjendani
Hanie Teki Tjendani
Universitas 17 Agustus 1945 Surabaya
在 untag-sby.ac.id 的电子邮件经过验证
标题
引用次数
引用次数
年份
Analysis of The Acceleration of Time and Cost of Implementing Building Construction Projects Using The Critical Path Method (CPM) Method
HN Yaqin, HT Tjendani, B Witjaksana
Devotion: Journal of Research and Community Service 4 (2), 336-346, 2023
192023
Project Scheduling Analysis Using The Critical Path Method–Case Study: Subsidized House Construction Project In Hill Mulya Housing, Samarinda City
GR Rakasyiwi, B Witjaksana, HT Tjendani
International Journal On Advanced Technology, Engineering, And Information …, 2022
192022
Cost And Time Analysis Using Earned Value Method Construction Of Upbjj Building Open University Of Surabaya Phase Ii
MR Asmoro, B Witjaksana, HT TJendani
Asian Journal Of Engineering, Social And Health 2 (12), 1799-1810, 2023
132023
Time Performance Analysis On Afv Earthwork In Kedungpeluk Sidoarjo Using The Earned Value Method
W Proboretno, B Witjaksana, HT Tjendani
Journal Of Humanities, Social Sciences And Business 3 (2), 465-475, 2024
122024
Cost And Time Analysis Using Earned Value Method In The Construction Of Sports Facilities In Kecamatan Kedewan Kabupaten Bojonegoro
SP Riduwan, B Witjaksana, HT Tjendani
Asian Journal Of Engineering, Social And Health 2 (12), 1604-1652, 2023
122023
ANALISIS MANAJEMEN RISIKO PELAKSANAAN PROYEK PEMBANGUNAN JALAN TOL MANADO-BITUNG SEKSI 2 STA 14+ 067–39+ 700
B Cahyono, B Witjaksana, HT Tjendani
Senakama: Prosiding Seminar Nasional Karya Ilmiah Mahasiswa 1 (1), 57-66, 2022
122022
Analisis Biaya Opersional Kendaraan Akibat Parkir Di Badan Jalan Pasar Wadung Asri Sidoarjo
A Muid, B Witjaksana, HT Tjendani
Senakama: Prosiding Seminar Nasional Karya Ilmiah Mahasiswa 1 (1), 1-12, 2022
122022
Acceleration Analysis Using the Crashing Method in the Sdn Kutisari 2 Development Project
MB Firdaus, HT Tjendani, B Witjaksana
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION …, 2023
112023
Two stage simulation to optimize risk sharing in performance-based contract on national road a system dynamic and game theory approach
HT Tjendani, N Anwar, A Wiguna
ARPN Journal of Engineering and Applied Sciences 13 (15), 4432, 2018
112018
Analysis of Contract Change Order (Cco) Costs in Building Construction Projects
WP Wibowo, B Witjaksana, HT TJendani
Asian Journal of Engineering, Social and Health 2 (12), 1719-732, 2023
102023
Cost And Time Analysis Of The Construction Of The 275 Kv 2cct Quadruple Zebra Sutet Project Gumawang–Gitet Lampung 1 Using The Time Cost Trade Off Method
B Witjaksana, HT TJendani
Asian Journal Of Engineering, Social And Health 2 (12), 1772-1778, 2023
102023
Cost and Time Analysis of The Pontianak MCD Building Project Using Time Cost Trade Off (TCTO) Method
OEA Muin, HT Tjendani, B Witjaksana
Asian Journal of Engineering, Social and Health 2 (12), 1569-1580, 2023
102023
Analysis of Contractor Performance on Stakeholder Satisfaction in Construction Expenditure Projects Rehabilitation of Malang City Using the PLS Method
W Ardhiansyah, HT Tjendani, B Witjaksana
Devotion: Journal of Research and Community Service 4 (1), 44-58, 2023
102023
Factors Influencing Contractor Performance In Jonge Lake Road Construction Work, Malang City
CT Prasetijo, HT Tjendani, B Witjaksana
Devotion: Journal of Research and Community Service 4 (1), 29-43, 2023
102023
Analysis of Risk Management in Building Workers of SMAN 5 Brawijaya Building Kediri
E Setiawan, B Witjaksana, HT Tjendani
International Journal on Advanced Technology, Engineering, and Information …, 2023
102023
Cost Analysis On The Construction Of Sports Facilities In Kedewan Sub-District, Bojonegoro District With EVM (Earned Value Method)
SP Riduwan, B Witjaksana, HT TJendani
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION …, 2023
102023
Analysis Of Factors Causing Variation Order In Construction Projects Of Pt. Tatamulia Nusantara Indah Surabaya Branch Office 2018-2022 Period
MA Imron, HT Tjendani, B Witjaksana
Devotion: Journal of Research and Community Service 3 (14), 2695-2706, 2022
102022
Analisis Perkuatan Struktur Beton dengan Menggunakan Carbon Fiber Reinforced Polymer (Cfrp), dan Glass Fiber Reinforced Polymer (Gfrp) Terhadap Biaya
DR Pranata, B Witjaksana, HT Tjendani
Senakama: Prosiding Seminar Nasional Karya Ilmiah Mahasiswa 1 (1), 35-45, 2022
102022
The cost of occupational safety and health (OSH) in construction project
R Marleno, HT Tjendani, AT Bon
Proceedings of the International Conference on Industrial Engineering and …, 2019
82019
Analisis Penjadwalan Pekerjaan Saluran Drainase Jalan Lintas Selatan Lot. 6 Kabupaten Tulungagung Dengan Metode PERT
AI Taranau, HT Tjendani
Jurnal Ilmiah Teknik dan Manajemen Industri 3 (1), 501-514, 2023
42023
系统目前无法执行此操作,请稍后再试。
文章 1–20