Assessing solution quality and computational performance in the hydro unit commitment problem considering different mathematical programming approaches EC Finardi, FYK Takigawa, BH Brito Electric Power Systems Research 136, 212-222, 2016 | 56 | 2016 |
Mixed-integer nonseparable piecewise linear models for the hydropower production function in the unit commitment problem BH Brito, EC Finardi, FYK Takigawa Electric Power Systems Research 182, 106234, 2020 | 48 | 2020 |
Unit-commitment via logarithmic aggregated convex combination in multi-unit hydro plants BH Brito, EC Finardi, FYK Takigawa Electric Power Systems Research 189, 106784, 2020 | 15 | 2020 |
Partitioning approach based on convex hull and multiple choice for solving hydro unit-commitment problems HG e Souza, EC Finardi, BH Brito, FYK Takigawa Electric Power Systems Research 211, 108285, 2022 | 12 | 2022 |
Exploring symmetry in a short-term hydro scheduling problem: The case of the Santo Antônio Hydro plant BH Brito, EC Finardi, FYK Takigawa, AI Pereira, RP Gosmann, LA Weiss, ... Journal of Water Resources Planning and Management 148 (1), 05021026, 2022 | 10 | 2022 |
Domain Partition of the Hydro Production Function for Solving Efficiently the Short-Term Generation Scheduling Problem BH Brito, EC Finardi, FYK Takigawa, PLR Nogueira, DTSA Morais, ... IEEE Access 9, 152780-152791, 2021 | 3 | 2021 |
Análise da produção de 24 meses de um sistema fotovoltaico conectado à rede no estado do Tocantins TC Belém, BH Brito, MS de Almeida, FT Bittencourt Congresso Brasileiro de Energia Solar-CBENS, 2018 | 2 | 2018 |
análise financeira de sistemas de microgeração fotovoltaica financiados em Palmas-TO BH Brito, ML Feitosa Anais Congresso Brasileiro de Energia Solar-CBENS, 2018 | 2 | 2018 |
Análise comparativa de diferentes metodologias para a solução do problema de comissionamento de unidades de usinas hidrelétricas acopladas em cascata BH BRITO Universidade Federal de Santa Catarina, Florianópolis, 2015 | 2 | 2015 |
Sistema de Recomendação de Distribuição Ótima de Carga para as Unidades Geradoras da Usina Hidrelétrica de Santo Antônio RP Gosmann, AI Pereira, LA Weiss, PT Mendes, BH Brito, ... Congresso Brasileiro de Automática-CBA 2 (1), 2020 | 1 | 2020 |
ANÁLISE DE VIABILIDADE DA GERAÇÃO DE ENERGIA EL TRICA ATRAVÓS DE BIODIGESTORES EM CRIAT RIO DE FRANGO NA FAZENDA SUCUPIRA EM PARAÍSO DO TOCANTINS FT de Almeida, BH Brito Revista Integralização Universitária, 114-132, 2018 | 1 | 2018 |
DESEMPENHO DE SISTEMAS FOTOVOLTAICOS CONECTADOS À REDE EM PALMAS-TO BH Brito, AP Bernardo, EC da Silva, GD Castro, M de Avila Dilli Anais Congresso Brasileiro de Energia Solar-CBENS, 2024 | | 2024 |
Real-Time Optimal Load Dispatch Recommendation System for the Santo Antônio Hydroelectric Power Plant BH Brito, AI Pereira, RP Gosmann, EC Finardi, DL dos Santos Abreu, ... Journal of Control, Automation and Electrical Systems 33, 268-281, 2022 | | 2022 |
IMPACTO DA LEI PALMAS SOLAR NA ANÁLISE FINANCEIRA DA MICROGERAÇÃO FOTOVOLTAICA EM PALMAS-TO IQ de Castro Carlos, BH Brito, FT Bittencourt Anais Congresso Brasileiro de Energia Solar-CBENS, 2018 | | 2018 |
IMPACTOS DOS INCENTIVOS DOS GOVERNOS DO ESTADO E DO MUNÍCIPIO NA MICROGERAÇÃO SOLAR FOTOVOLTAICA EM PALMAS-TO AC do Nascimento Silva, BH Brito Anais Congresso Brasileiro de Energia Solar-CBENS, 2018 | | 2018 |
EXPERIÊNCIA DE CURSO GRATUITO DE INSTALADOR DE SISTEMAS FOTOVOLTAICOS CONECTADOS À REDE OFERECIDO PELO IFTO CAMPUS PALMAS CS Santos, AR Martins, BH Brito, AP CARVALHO Anais Congresso Brasileiro de Energia Solar-CBENS, 2018 | | 2018 |
XV Simpósio de Especialistas em Planejamento da Operação e Expansão Elétrica Março 15–18, 2022–Foz do Iguaçu/PR-Brazil RP Gosmann, AI Pereira, LA Weiss, BM Machado, BH Brito, EC Finardi, ... | | |