关注
Kibeom Kwon
Kibeom Kwon
在 korea.ac.kr 的电子邮件经过验证
标题
引用次数
引用次数
年份
Surface settlement prediction for urban tunneling using machine learning algorithms with Bayesian optimization
D Kim, K Kwon, K Pham, JY Oh, H Choi
Automation in construction 140, 104331, 2022
462022
A causal network-based risk matrix model applicable to shield TBM tunneling projects
H Chung, J Park, BK Kim, K Kwon, IM Lee, H Choi
Sustainability 13 (9), 4846, 2021
122021
A study on EPB shield TBM face pressure prediction using machine learning algorithms
K Kwon, H Choi, JY Oh, D Kim
Journal of Korean Tunnelling and Underground Space Association 24 (2), 217-230, 2022
102022
Prioritization of hazardous zones using an advanced risk management model combining the analytic hierarchy process and fuzzy set theory
K Kwon, M Kang, D Kim, H Choi
Sustainability 15 (15), 12018, 2023
82023
Laboratory simulations on hybrid non-destructive survey of electrical resistivity and induced polarization to predict geological risks ahead of a TBM tunnel
M Kang, J Lee, K Kwon, S Park, H Choi
Tunnelling and Underground Space Technology 135, 105066, 2023
32023
Optimization of electrical resistivity survey utilizing modified harmony search algorithm to predict anomalous zone ahead of tunnel faces
Y Yoon, H Choi, K Kwon, B Hwang, M Kang
Measurement 223, 113747, 2023
22023
Evaluation of Korean recycled aggregates as backfilling underground power system considering particle breakage effect
D Kim, K Kwon, G Kim, H Choi
Journal of Material Cycles and Waste Management 23, 1665-1677, 2021
22021
Laboratory experiments for hazardous ground prediction ahead of a TBM tunnel face based on resistivity and induced polarization
M Kang, J Lee, S Park, K Kwon, H Choi
Expanding Underground-Knowledge and Passion to Make a Positive Impact on the …, 2023
12023
Study on Risk Priority for TBM Tunnel Collapse based on Bayes Theorem through Case Study
K Kwon, M Kang, B Hwang, H Choi
KSCE Journal of Civil and Environmental Engineering Research 43 (6), 785-791, 2023
12023
Machine learning-based prediction model for disc cutter life in TBM excavation through hard rock formations
YJ Shin, K Kwon, A Bae, H Choi, D Kim
Tunnelling and Underground Space Technology 150, 105826, 2024
2024
Numerical simulations on electrical resistivity survey to predict mixed ground ahead of a TBM tunnel
S Yang, H Choi, K Kwon, C Hwang, M Kang
Journal of Korean Tunnelling and Underground Space Association 25 (6), 403-421, 2023
2023
Stage-updated TBM operational parameter prediction model using random forest algorithm
D Kim, KH Lee, NY Kim, K Kwon, H Choi
Expanding Underground-Knowledge and Passion to Make a Positive Impact on the …, 2023
2023
Evaluating rheological properties of excavated soil for EPB shield TBM with foam and polymer
B Hwang, M Kang, K Kwon, J Yang, H Choi
Journal of Korean Tunnelling and Underground Space Association 25 (5), 387-401, 2023
2023
Interpretable Risk Management for Tbm Tunneling Using Expert Elicitation Integrated with Fuzzy Set Theory
K Kwon, M Kang, YJ Shin, B Ahn, H Choi
Available at SSRN 4846954, 0
Intelligent Support System Implementing Machine Learning and Statistical Analysis for Predicting Ground Settlement Induced by Tbm Excavation
K Kwon, M Kang, D Kim, K Pham, H Choi
Available at SSRN 4750349, 0
Predicting Geological Risks Ahead of a Tunnel Face Using Electrical Resistivity Survey: A Numerical and Machine Learning Approach
M Kang, K Pham, K Kwon, H Choi
Hangseok, Predicting Geological Risks Ahead of a Tunnel Face Using …, 0
Class Certainty-Based Risk Matrix Model for Tbm Tunneling Incorporating Fuzzy Set Theory and Analytic Hierarchy Process
K Kwon, M Kang, YJ Shin, B Ahn, H Choi
Available at SSRN 4460046, 0
系统目前无法执行此操作,请稍后再试。
文章 1–17