Exact and heuristic approaches for the cycle hub location problem I Contreras, M Tanash, N Vidyarthi Annals of Operations Research 258, 655-677, 2017 | 59 | 2017 |
An exact algorithm for the modular hub location problem with single assignments M Tanash, I Contreras, N Vidyarthi Computers & Operations Research 85, 32-44, 2017 | 57 | 2017 |
The cycle hub location problem I Contreras, M Tanash, N Vidyarthi CIRRELT, Centre interuniversitaire de recherche sur les réseaux d'entreprise …, 2013 | 15 | 2013 |
Artificial intelligence applications in project scheduling: a systematic review, bibliometric analysis, and prospects for future research Z Bahroun, M Tanash, R As’ad, M Alnajar Management Systems in Production Engineering 31 (2), 144-161, 2023 | 8 | 2023 |
A PDCA framework towards a multi-response optimization of process parameters based on Taguchi-Fuzzy model M Tanash, R Al Athamneh, D Bani Hani, M Rababah, Z Albataineh Processes 10 (9), 1894, 2022 | 5 | 2022 |
The reliability of SAC305 individual solder joints during creep–fatigue conditions at room temperature M Abueed, R Al Athamneh, M Tanash, S Hamasha Crystals 12 (9), 1306, 2022 | 5 | 2022 |
A branch and cut algorithm for the cycle hub location problem I Contreras, M Tanash, N Vidyarthi Ann. Oper. Res. Forthcoming, 2015 | 4 | 2015 |
Factor Analysis of Quality Management Systems Implementation in Healthcare: An Online Survey M Rawshdeh, H Keathley, S Obeidat, R Athamenh, M Tanash, ... Healthcare 10 (10), 1828, 2022 | 3 | 2022 |
Hub Network Design and Discrete Location: Economies of Scale, Reliability and Service Level Considerations M Tanash Concordia University, 2018 | 2 | 2018 |
Variable Neighborhood Search Algorithm for the Single Assignment Incomplete Hub Location Problem with Modular Capacities and Direct Connections RAL Athamneh, M Tanash, DB Hani, M Rawshdeh, A Alawin, ... Operations Research Perspectives 11, 100286, 2023 | 1 | 2023 |
Aligning key performance indicators with lean management in the service sector: A case study for a Jordanian telecommunication company A Alalawin, AM Qamar, WH AlAlaween, Y Bentahar, T Al-Halaybeh, ... Cogent Engineering 9 (1), 2124940, 2022 | 1 | 2022 |
The Multi-Skilled Resource-Constrained Project Scheduling Problem: A Systematic Review and an Exploration of Future Landscapes Z Bahroun, R As’ad, M Tanash, R Athamneh Management Systems in Production Engineering 32 (1), 108-132, 2024 | | 2024 |