关注
Lei Wang
标题
引用次数
引用次数
年份
A novel interval dynamic reliability computation approach for the risk evaluation of vibration active control systems based on PID controllers
L Wang, J Liu, C Yang, D Wu
Applied Mathematical Modelling 92, 422-446, 2021
1272021
A novel method of non-probabilistic reliability-based topology optimization corresponding to continuum structures with unknown but bounded uncertainties
L Wang, D Liu, Y Yang, X Wang, Z Qiu
Computer Methods in Applied Mechanics and Engineering 326, 573-595, 2017
1212017
A dimension-wise method and its improvement for multidisciplinary interval uncertainty analysis
L Wang, C Xiong, X Wang, M Xu, Y Li
Applied Mathematical Modelling 59, 680-695, 2018
1142018
Artificial Neural Network (ANN)-Bayesian Probability Framework (BPF) based method of dynamic force reconstruction under multi-source uncertainties
Y Liu, L Wang, K Gu, M Li
Knowledge-based systems 237, 107796, 2022
1042022
An inverse method for distributed dynamic load identification of structures with interval uncertainties
L Wang, Y Liu, Y Liu
Advances in Engineering Software 131, 77-89, 2019
972019
Reliability estimation of fatigue crack growth prediction via limited measured data
L Wang, X Wang, H Su, G Lin
International Journal of Mechanical Sciences 121, 44-57, 2017
932017
Evidence theory-based reliability optimization for cross-scale topological structures with global stress, local displacement, and micro-manufacturing constraints
L Wang, X Zhao, Z Wu, W Chen
Structural and Multidisciplinary Optimization 65 (1), 23, 2022
862022
Hybrid reliability analysis of structures with multi-source uncertainties
L Wang, X Wang, Y Xia
Acta Mechanica 225 (2), 413-430, 2014
852014
Time-dependent reliability-based optimization for structural-topological configuration design under convex-bounded uncertain modeling
L Wang, Y Liu, M Li
Reliability Engineering & System Safety 221, 108361, 2022
802022
A novel method of distributed dynamic load identification for aircraft structure considering multi-source uncertainties
L Wang, Y Liu
Structural and Multidisciplinary Optimization 61 (5), 1929-1952, 2020
792020
A novel methodology of reliability-based multidisciplinary design optimization under hybrid interval and fuzzy uncertainties
L Wang, C Xiong, Y Yang
Computer Methods in Applied Mechanics and Engineering 337, 439-457, 2018
792018
A modified leaky ReLU scheme (MLRS) for topology optimization with multiple materials
Y Liu, X Wang, L Wang, D Liu
Applied Mathematics and Computation 352, 188-204, 2019
782019
Probability and convexity concepts are not antagonistic
X Wang, L Wang, I Elishakoff, Z Qiu
Acta Mechanica 219, 45-64, 2011
732011
The need for introduction of non-probabilistic interval conceptions into structural analysis and design
ZP Qiu, L Wang
Science China. Physics, Mechanics & Astronomy 59 (11), 114632, 2016
722016
A non-probabilistic time-variant reliable control method for structural vibration suppression problems with interval uncertainties
L Wang, X Wang, Y Li, J Hu
Mechanical Systems and Signal Processing 115, 301-322, 2019
692019
Structural time‐dependent reliability assessment of the vibration active control system with unknown‐but‐bounded uncertainties
L Wang, X Wang, Y Li, G Lin, Z Qiu
Structural Control and Health Monitoring 24 (10), e1965, 2017
682017
An iterative dimension-by-dimension method for structural interval response prediction with multidimensional uncertain variables
C Xiong, L Wang, G Liu, Q Shi
Aerospace Science and Technology 86, 572-581, 2019
652019
Comparison of the reliability-based and safety factor methods for structural design
X Wang, Q Shi, W Fan, R Wang, L Wang
Applied Mathematical Modelling 72, 68-84, 2019
642019
A feature-driven robust topology optimization strategy considering movable non-design domain and complex uncertainty
Z Li, L Wang, Z Luo
Computer Methods in Applied Mechanics and Engineering 401, 115658, 2022
632022
A radial basis function artificial neural network (RBF ANN) based method for uncertain distributed force reconstruction considering signal noises and material dispersion
L Wang, Y Liu, K Gu, T Wu
Computer Methods in Applied Mechanics and Engineering 364, 112954, 2020
622020
系统目前无法执行此操作,请稍后再试。
文章 1–20