An artificial immune algorithm for the flexible job-shop scheduling problem A Bagheri, M Zandieh, I Mahdavi, M Yazdani Future Generation Computer Systems 26 (4), 533-541, 2010 | 349 | 2010 |
Flexible job-shop scheduling with parallel variable neighborhood search algorithm M Yazdani, M Amiri, M Zandieh Expert Systems with Applications 37 (1), 678-687, 2010 | 339 | 2010 |
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times M Zandieh, SMTF Ghomi, SMM Husseini Applied Mathematics and Computation 180 (1), 111-127, 2006 | 319 | 2006 |
Scheduling trucks in cross-docking systems: Robust meta-heuristics B Vahdani, M Zandieh Computers & Industrial Engineering 58 (1), 12-24, 2010 | 288 | 2010 |
Multi-objective scheduling of dynamic job shop using variable neighborhood search MA Adibi, M Zandieh, M Amiri Expert Systems with Applications 37 (1), 282-287, 2010 | 250 | 2010 |
A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms E Ahmadi, M Zandieh, M Farrokh, SM Emami Computers & operations research 73, 56-66, 2016 | 247 | 2016 |
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness B Naderi, M Zandieh, AKG Balagh, V Roshanaei Expert systems with Applications 36 (6), 9625-9633, 2009 | 238 | 2009 |
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem E Moradi, SMTF Ghomi, M Zandieh Expert systems with applications 38 (6), 7169-7178, 2011 | 204 | 2011 |
Bi-objective group scheduling in hybrid flexible flowshop: a multi-phase approach N Karimi, M Zandieh, HR Karamooz Expert Systems with Applications 37 (6), 4024-4032, 2010 | 193 | 2010 |
A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem SHA Rahmati, M Zandieh The International Journal of Advanced Manufacturing Technology 58, 1115-1129, 2012 | 188 | 2012 |
Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage ARB Arabani, SMTF Ghomi, M Zandieh Expert systems with Applications 38 (3), 1964-1979, 2011 | 187 | 2011 |
Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm J Behnamian, M Zandieh, SMTF Ghomi Expert Systems with Applications 36 (6), 9637-9644, 2009 | 177 | 2009 |
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic J Behnamian, SMTF Ghomi, M Zandieh Expert Systems with Applications 36 (8), 11057-11069, 2009 | 171 | 2009 |
A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem E Shokrollahpour, M Zandieh, B Dorri International Journal of Production Research 49 (11), 3087-3103, 2011 | 169 | 2011 |
Reviewing the intellectual structure and evolution of the innovation systems approach: A social network analysis MB Dahesh, G Tabarsa, M Zandieh, M Hamidizadeh Technology in Society 63, 101399, 2020 | 150 | 2020 |
Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns M Gholami, M Zandieh, A Alem-Tabriz The International Journal of Advanced Manufacturing Technology 42, 189-201, 2009 | 150 | 2009 |
Flexible job shop scheduling under condition-based maintenance: improved version of imperialist competitive algorithm M Zandieh, AR Khatami, SHA Rahmati Applied soft computing 58, 449-464, 2017 | 149 | 2017 |
Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop M Gholami, M Zandieh Journal of Intelligent Manufacturing 20, 481-498, 2009 | 149 | 2009 |
Algorithms for a realistic variant of flowshop scheduling B Naderi, R Ruiz, M Zandieh Computers & Operations Research 37 (2), 236-246, 2010 | 145 | 2010 |
Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness B Naderi, M Zandieh, V Roshanaei The International Journal of Advanced Manufacturing Technology 41, 1186-1198, 2009 | 139 | 2009 |