关注
Kyung-In Kang
Kyung-In Kang
未知所在单位机构
在 korea.ac.kr 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning
GH Kim, SH An, KI Kang
Building and environment 39 (10), 1235-1242, 2004
7152004
A case-based reasoning cost estimating model using experience by analytic hierarchy process
SH An, GH Kim, KI Kang
Building and Environment 42 (7), 2573-2579, 2007
2702007
Neural network model incorporating a genetic algorithm in estimating construction costs
GH Kim, JE Yoon, SH An, HH Cho, KI Kang
Building and Environment 39 (11), 1333-1340, 2004
1912004
Development of a mobile safety monitoring system for construction sites
UK Lee, JH Kim, H Cho, KI Kang
Automation in Construction 18 (3), 258-264, 2009
1702009
Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
GH Kim, DS Seo, KI Kang
Journal of computing in civil engineering 19 (2), 208-211, 2005
1402005
Experimental study on the shear strength of recycled aggregate concrete beams
HB Choi, CK Yi, HH Cho, KI Kang
Magazine of Concrete Research 62 (2), 103-114, 2010
1352010
Application of support vector machines in assessing conceptual cost estimates
SH An, UY Park, KI Kang, MY Cho, HH Cho
Journal of computing in civil engineering 21 (4), 259-264, 2007
1062007
Improving tower crane productivity using wireless technology
UK Lee, KI Kang, GH Kim, HH Cho
Computer‐Aided Civil and Infrastructure Engineering 21 (8), 594-604, 2006
942006
Application of information technology for mass customization in the housing construction industry in Korea
Y Shin, SH An, HH Cho, GH Kim, KI Kang
Automation in Construction 17 (7), 831-838, 2008
732008
A formwork method selection model based on boosted decision trees in tall building construction
Y Shin, T Kim, H Cho, KI Kang
Automation in Construction 23, 47-54, 2012
702012
Bond behaviour of deformed bars embedded in RAC
HB Choi, KI Kang
Magazine of Concrete Research 60 (6), 399-410, 2008
582008
Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction
Y Shin, H Cho, KI Kang
Automation in Construction 20 (5), 550-558, 2011
542011
An experience curve-based decision support model for prioritizing restoration needs of cultural heritage
CJ Kim, WS Yoo, UK Lee, KJ Song, KI Kang, H Cho
Journal of Cultural Heritage 11 (4), 430-437, 2010
522010
Advanced formwork method integrated with a layout planning model for tall building construction
T Kim, H Lim, UK Lee, M Cha, H Cho, KI Kang
Canadian Journal of Civil Engineering 39 (11), 1173-1183, 2012
412012
Genetic algorithm-based steel erection planning model for a construction automation system
WS Yoo, HJ Lee, DI Kim, KI Kang, H Cho
Automation in Construction 24, 30-39, 2012
312012
Application of adaboost to the retaining wall method selection in construction
Y Shin, DW Kim, JY Kim, KI Kang, MY Cho, HH Cho
Journal of Computing in Civil Engineering 23 (3), 188-192, 2009
302009
Improved productivity using a modified table formwork system for high-rise building in Korea
GH Kim, SH An, HH Cho, DS Seo, KI Kang
Building and environment 40 (11), 1472-1478, 2005
292005
Development of conceptual model of construction factory for automated construction
DW Kim, SH An, H Cho, JW Jeong, BH Lee, NL Doh, KI Kang
Building and Environment 44 (8), 1634-1642, 2009
222009
Mass concrete curing management based on ubiquitous computing
UK Lee, KI Kang, GH Kim
Computer‐Aided Civil and Infrastructure Engineering 21 (2), 148-155, 2006
142006
Modified braced wall system with pre-stressed wale for excavation in urban areas
GH Kim, UK Lee, U Park, JY Kim, KI Kang
Building and environment 40 (12), 1689-1696, 2005
132005
系统目前无法执行此操作,请稍后再试。
文章 1–20