Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning GH Kim, SH An, KI Kang Building and environment 39 (10), 1235-1242, 2004 | 715 | 2004 |
A case-based reasoning cost estimating model using experience by analytic hierarchy process SH An, GH Kim, KI Kang Building and Environment 42 (7), 2573-2579, 2007 | 270 | 2007 |
Neural network model incorporating a genetic algorithm in estimating construction costs GH Kim, JE Yoon, SH An, HH Cho, KI Kang Building and Environment 39 (11), 1333-1340, 2004 | 191 | 2004 |
Development of a mobile safety monitoring system for construction sites UK Lee, JH Kim, H Cho, KI Kang Automation in Construction 18 (3), 258-264, 2009 | 170 | 2009 |
Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates GH Kim, DS Seo, KI Kang Journal of computing in civil engineering 19 (2), 208-211, 2005 | 140 | 2005 |
Experimental study on the shear strength of recycled aggregate concrete beams HB Choi, CK Yi, HH Cho, KI Kang Magazine of Concrete Research 62 (2), 103-114, 2010 | 135 | 2010 |
Application of support vector machines in assessing conceptual cost estimates SH An, UY Park, KI Kang, MY Cho, HH Cho Journal of computing in civil engineering 21 (4), 259-264, 2007 | 106 | 2007 |
Improving tower crane productivity using wireless technology UK Lee, KI Kang, GH Kim, HH Cho Computer‐Aided Civil and Infrastructure Engineering 21 (8), 594-604, 2006 | 94 | 2006 |
Application of information technology for mass customization in the housing construction industry in Korea Y Shin, SH An, HH Cho, GH Kim, KI Kang Automation in Construction 17 (7), 831-838, 2008 | 73 | 2008 |
A formwork method selection model based on boosted decision trees in tall building construction Y Shin, T Kim, H Cho, KI Kang Automation in Construction 23, 47-54, 2012 | 70 | 2012 |
Bond behaviour of deformed bars embedded in RAC HB Choi, KI Kang Magazine of Concrete Research 60 (6), 399-410, 2008 | 58 | 2008 |
Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction Y Shin, H Cho, KI Kang Automation in Construction 20 (5), 550-558, 2011 | 54 | 2011 |
An experience curve-based decision support model for prioritizing restoration needs of cultural heritage CJ Kim, WS Yoo, UK Lee, KJ Song, KI Kang, H Cho Journal of Cultural Heritage 11 (4), 430-437, 2010 | 52 | 2010 |
Advanced formwork method integrated with a layout planning model for tall building construction T Kim, H Lim, UK Lee, M Cha, H Cho, KI Kang Canadian Journal of Civil Engineering 39 (11), 1173-1183, 2012 | 41 | 2012 |
Genetic algorithm-based steel erection planning model for a construction automation system WS Yoo, HJ Lee, DI Kim, KI Kang, H Cho Automation in Construction 24, 30-39, 2012 | 31 | 2012 |
Application of adaboost to the retaining wall method selection in construction Y Shin, DW Kim, JY Kim, KI Kang, MY Cho, HH Cho Journal of Computing in Civil Engineering 23 (3), 188-192, 2009 | 30 | 2009 |
Improved productivity using a modified table formwork system for high-rise building in Korea GH Kim, SH An, HH Cho, DS Seo, KI Kang Building and environment 40 (11), 1472-1478, 2005 | 29 | 2005 |
Development of conceptual model of construction factory for automated construction DW Kim, SH An, H Cho, JW Jeong, BH Lee, NL Doh, KI Kang Building and Environment 44 (8), 1634-1642, 2009 | 22 | 2009 |
Mass concrete curing management based on ubiquitous computing UK Lee, KI Kang, GH Kim Computer‐Aided Civil and Infrastructure Engineering 21 (2), 148-155, 2006 | 14 | 2006 |
Modified braced wall system with pre-stressed wale for excavation in urban areas GH Kim, UK Lee, U Park, JY Kim, KI Kang Building and environment 40 (12), 1689-1696, 2005 | 13 | 2005 |