Probabilistic forecasting of project performance using stochastic S curves GA Barraza, WE Back, F Mata Journal of construction engineering and management 130 (1), 25-32, 2004 | 231 | 2004 |
Probabilistic monitoring of project performance using SS-curves GA Barraza, WE Back, F Mata Journal of Construction Engineering and Management 126 (2), 142-148, 2000 | 178 | 2000 |
Defining triangular probability distributions from historical cost data WE Back, WW Boles, GT Fry Journal of Construction Engineering and Management 126 (1), 29-37, 2000 | 130 | 2000 |
Multiple simulation analysis for probabilistic cost and schedule integration LJ Isidore, WE Back Journal of Construction Engineering and Management 128 (3), 211-219, 2002 | 106 | 2002 |
Critical activities in the front-end planning process R George, LC Bell, W Edward Back Journal of Management in Engineering 24 (2), 66-74, 2008 | 89 | 2008 |
Information management strategies for project management WE Back, KA Moreau Project Management Journal 32 (1), 10-19, 2001 | 86 | 2001 |
Cost and schedule impacts of information management on EPC process WE Back, KA Moreau Journal of management in engineering 16 (2), 59-70, 2000 | 83 | 2000 |
Activity-based costing as a tool for process improvement evaluations WE Back, DA Maxwell, LJ Isidore Journal of Management in Engineering 16 (2), 48-58, 2000 | 55 | 2000 |
Industry expectations for engineering graduates W Edward Back, SR Sanders Engineering, Construction and Architectural Management 5 (2), 137-143, 1998 | 49 | 1998 |
Improving the design process with information management KA Moreau, WE Back Automation in construction 10 (1), 127-140, 2000 | 45 | 2000 |
Ranking procedure on maintenance tasks for monitoring of embankment dams GR Andersen, LE Chouinard, C Bouvier, WE Back Journal of geotechnical and geoenvironmental engineering 125 (4), 247-259, 1999 | 45 | 1999 |
Quantifying process benefits of electronic data management technologies WE Back, LC Bell Journal of construction engineering and management 121 (4), 415-421, 1995 | 41 | 1995 |
Probabilistic optimal-cost scheduling LJ Isidore, WE Back Journal of Construction Engineering and Management 127 (6), 431-437, 2001 | 40 | 2001 |
Optimization of crew configurations using activity-based costing DA Maxwell, WE Back, J Toon Journal of construction engineering and management 124 (2), 162-168, 1998 | 32 | 1998 |
Predictability index: Novel metric to assess cost and schedule performance D Grau, WE Back Journal of Construction Engineering and Management 141 (12), 04015043, 2015 | 28 | 2015 |
Benefits of on-site design to project performance measures D Grau, WE Back, JR Prince Journal of Management in Engineering 28 (3), 232-242, 2012 | 26 | 2012 |
Determining the impact of information management on project schedule and cost WE Back, KA Moreau, J Toon Research Rep 125 (11), 1996 | 23 | 1996 |
Monte Carlo simulation as tool for process reengineering WE Back, LC Bell Journal of Management in Engineering 11 (5), 46-53, 1995 | 23 | 1995 |
Quantifying benefits of electronic technology applied to bulk materials management WE Back Clemson University, 1994 | 22 | 1994 |
Effectiveness evaluation of contract incentives on project performance WE Back, D Grau, G Mejia-Aguilar International Journal of Construction Education and Research 9 (4), 288-306, 2013 | 21 | 2013 |