Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities PA de Andrade, A Martens, M Vanhoucke Automation in Construction 99, 68-78, 2019 | 85 | 2019 |
A multivariate approach for top-down project control using earned value management J Colin, A Martens, M Vanhoucke, M Wauters Decision Support Systems 79, 65-76, 2015 | 75 | 2015 |
A buffer control method for top-down project control A Martens, M Vanhoucke European Journal of Operational Research 262 (1), 274-286, 2017 | 65 | 2017 |
The impact of applying effort to reduce activity variability on the project time and cost performance A Martens, M Vanhoucke European Journal of Operational Research 277 (2), 442-453, 2019 | 40 | 2019 |
Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control J Song, A Martens, M Vanhoucke European Journal of Operational Research 297 (2), 451-466, 2022 | 37 | 2022 |
Integrating corrective actions in project time forecasting using exponential smoothing A Martens, M Vanhoucke Journal of Management in Engineering 36 (5), 04020044, 2020 | 28 | 2020 |
An empirical validation of the performance of project control tolerance limits A Martens, M Vanhoucke Automation in Construction 89, 71-85, 2018 | 28 | 2018 |
The integration of constrained resources into top-down project control A Martens, M Vanhoucke Computers & Industrial Engineering 110, 277-288, 2017 | 23 | 2017 |
Using schedule risk analysis with resource constraints for project control J Song, A Martens, M Vanhoucke European Journal of Operational Research 288 (3), 736-752, 2021 | 19 | 2021 |
The impact of a limited budget on the corrective action taking process J Song, A Martens, M Vanhoucke European Journal of Operational Research 286 (3), 1070-1086, 2020 | 17 | 2020 |
An empirical project forecasting accuracy framework using project regularity PA Andrade, M Vanhoucke, A Martens Annals of Operations Research, 1-21, 2023 | 3 | 2023 |
Analysis of the impact of corrective actions for stochastic project networks F Vaseghi, A Martens, M Vanhoucke European Journal of Operational Research 316 (2), 503-518, 2024 | 1 | 2024 |
An empirical project forecasting accuracy framework using project regularity P André de Andrade, M Vanhoucke, A Martens Springer, 2024 | | 2024 |
A Simulation Study on the Impact of Activity Crashing on the Project Duration and Cost under Different Budget Release Scenarios J Song, T Servranckx, A Martens, M Vanhoucke 2020 15th Conference on Computer Science and Information Systems (FedCSIS …, 2020 | | 2020 |
Buffer management methods for project control A Martens Ghent University, 2018 | | 2018 |
Buffer monitoring: setting thresholds for corrective actions A Martens, M Vanhoucke 15th International Conference on Project Management and Scheduling, 268-271, 2016 | | 2016 |
Using exponential smoothing to integrate the impact of corrective actions on project time forecasting A Martens, M Vanhoucke Book of Extended Abstracts, 237, 0 | | |
Applying a cost, resource or risk perspective to improve tolerance limits for project control: an empirical validation A Martens, M Vanhoucke 16th International Conference on Project Management and Scheduling Rome …, 0 | | |