关注
Nur Yulianti Hidayah
Nur Yulianti Hidayah
Pancasila University
在 univpancasila.ac.id 的电子邮件经过验证
标题
引用次数
引用次数
年份
Analisis Pemeliharaan Mesin Blowmould Dengan Metode RCM Di PT. CCAI
NYH Noor Ahmadi
Jurnal Optimasi Sistem Industri 16 (2), 167-176, 2017
1012017
DETERMINING THE KEY CRITERIA DEVELOPMENT OF RENEWABLE ENERGY IN INDONESIA USING A COMBINATION ISM AND AHP METHODS
D RIMANTHO, WA PUTRA, NURY HIDAYAH
Journal of Sustainability Science and Management 13 (2), 117-127, 2018
192018
The strategy for developing wood pellets as sustainable renewable energy in Indonesia
D Rimantho, NY Hidayah, VA Pratomo, A Saputra, I Akbar, AS Sundari
Heliyon 9 (3), 2023
182023
Metropolitan Cities's Waste Transportation Model
AH Ismail, YV Usman, NY Hidayah, L Chairani
Procedia-Social and Behavioral Sciences 65, 1046-1053, 2012
132012
Membangun Masyarakat Mandiri dimasa Pandemi COVID-19 Melalui Pelatihan Akutansi Biaya Produk dan Teknik Pemasaran Digital
D Fitriati, NY Hidayah, F Maspiyanti
Dinamisia: Jurnal Pengabdian Kepada Masyarakat 5 (4), 2021
102021
Tingkat pengetahuan, sikap, dan praktik pengelolaan sampah berkelanjutan mahasiswa Fakultas Teknik Universitas Pancasila, Jakarta, Indonesia
NY Hidayah, A Herzanita, D Rimantho
Jurnal Teknologi 13 (2), 171-178, 2021
102021
Strategi pengelolaan sampah melalui pendekatan SWOT: studi kasus Pondok Pesantren Qur’an Al-Hikmah Bogor
D Rimantho, NY Hidayah, A Saputra, A Chandra, AN Rizkiya, G Nazhifah, ...
Jurnal Pengelolaan Lingkungan Berkelanjutan (Journal of Environmental …, 2022
92022
Pengembangan model pemilihan lokasi pembuangan akhir sampah perkotaan (Studi kasus: Kota Jakarta Timur)
YV Usman, AH Ismail, NY Hidayah, L Chairani
lppmums, 2013
82013
Analysis of risk failure of solid waste management processes in universities: Case Study of Pancasila University Jakarta
D Rimantho, NY Hidayah, A Herzanita
IOP Conference Series: Earth and Environmental Science 399 (1), 012045, 2019
62019
Analisis Pengaruh Faktor Kebisingan dan Tingkat Kesulitan Kerja terhadap Produktivitas Line Assembling PT
NY Hidayah, D Latifah, W Ratih
X http://image. tsubaku. multiply. multiplycontent. com/. Diakses 16, 2011
62011
Analisis Pemeliharaan Mesin Blowmould Dengan Metode RCM Di PT
A Noor, HN Yulianti
CCAI, Jurusan Teknik Industri, Fakultas Teknik, Universitas Pancasila, 2017
52017
ANALISIS PERBAIKAN POWER QUALITY UNTUK PENCAPAIAN EFISIENSI ENERGI DI RS. X
NY Hidayah, D Rahmawaty
Jurnal Sistem Industri 7 (1), 46-57, 2013
52013
Penerapan Pengelolaan Limbah Padat di Fakultas Teknik Universitas Pancasila Dalam Mewujudkan Green Campus
A Herzanita, D Rimantho, NH Yulianti, A Sandi
Jurnal Janata 1 (2), 42-49, 2021
42021
Reducing project duration of an apartment project by Waskita Karya using crashing method
KR Ririh, NY Hidayah
IOP Conference Series: Materials Science and Engineering 852 (1), 012087, 2020
42020
UTILIZATION OF THE ORGANIC AND INORGANIC SOLID WASTE AS ACOUSTIC MATERIAL
D Rimantho, NY Hidayah, EA Pane
ARPN Journal of Engineering and Applied Sciences 14 (8), 1502-1506, 2019
42019
Analisis Penurunan Tingkat Inventory dan Lead Time Proses Produksi dengan Sistem Just in Time di PT. CG Power Systems Indonesia
R Ferdizal, NY Hidayah
Seminar Nasional IENACO-2017, 334-341, 2017
42017
FAKTOR PENYEBAB KERUSAKAN SISTEM MESIN PADA BUS APTB PPD
NYH Laela Chairani, Yulita Veranda Usman
Jurnal Ilmiah Teknik Industri 14 (No. 1, Juni 2015), 36-46, 2015
4*2015
Pemberdayaan Perempuan dan keluarga melalui diversifikasi produk rumput laut di Kepulauan Seribu
NY Hidayah
Jurnal Pengabdian Masyarakat Teknik 4 (1), 55-62, 2022
32022
Strategi Perbaikan Produksi Kemeja Di Umkm Konveksi
AS Sundari, YH Jwalita, D Rimantho, NY Hidayah
Sustainable Environmental and Optimizing Industry Journal 3 (1), 18-26, 2021
32021
Analisis Uji Kemampuan Komposit Berbahan Dasar Limbah Dalam Fungsi Penyerapan Suara
AH Nur Yulianti Hidayah, Dino Rimantho, Anggina Sandy Sundari
JMPM: Jurnal Material dan Proses Manufaktur 5 (1), 18-24, 2021
3*2021
系统目前无法执行此操作,请稍后再试。
文章 1–20