Asymmetric causality among renewable energy consumption, CO2 emissions, and economic growth in KSA: evidence from a non-linear ARDL model S Toumi, H Toumi Environmental Science and Pollution Research 26, 16145-16156, 2019 | 120 | 2019 |
A variable neighborhood search algorithm for the capacitated vehicle routing problem M Amous, S Toumi, B Jarboui, M Eddaly Electronic Notes in Discrete Mathematics 58, 231-238, 2017 | 49 | 2017 |
Investigation of the N-shaped environmental Kuznets curve for COVID-19 mitigation in the KSA A Aljadani, H Toumi, S Toumi, M Hsini, B Jallali Environmental Science and Pollution Research 28, 29681-29700, 2021 | 37 | 2021 |
Branch-and-bound algorithm for solving blocking flowshop scheduling problems with makespan criterion S Toumi, B Jarboui, M Eddaly, A Rebaï International Journal of Mathematics in Operational Research 10 (1), 34-48, 2017 | 26 | 2017 |
GVNS based heuristic for solving the multi-product multi-vehicle inventory routing problem S Hasni, S Toumi, B Jarboui, A Mjirda Electronic Notes in Discrete Mathematics 58, 71-78, 2017 | 15 | 2017 |
0–1 quadratic knapsack problem solved with vns algorithm S Toumi, M Cheikh, B Jarboui Electronic Notes in Discrete Mathematics 47, 269-276, 2015 | 12 | 2015 |
Branch and bound algorithm for solving blocking flowshop scheduling problem with total tardiness and total weighted tardiness criteria S Toumi, B Jarboui, M Eddaly, A Rebaï International Journal of Operational Research 30 (4), 441-459, 2017 | 11 | 2017 |
MILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags I Hamdi, S Toumi Journal of Industrial Engineering International 15, 223-229, 2019 | 7 | 2019 |
Lower bounds on the total tardiness and total weighted tardiness for scheduling flowshop with blocking S Toumi, B Jarboui, M Eddaly, A Rebaï 2013 International Conference on Advanced Logistics and Transport, 296-301, 2013 | 4 | 2013 |
An efficient branch and bound algorithm to solve the permutation flowshop scheduling problem with blocking constraints S Toumi, B Jarboui, M Eddaly, A Rebai 2013 5th International Conference on Modeling, Simulation and Applied …, 2013 | 4 | 2013 |
Solving blocking flowshop scheduling problem with branch and bound algorithm S Toumi, B Jarboui, M Eddaly, A Rebaï 2013 International Conference on Advanced Logistics and Transport, 411-416, 2013 | 3 | 2013 |
Branch and bound algorithm for solving blocking flowshop scheduling problem with total completion time S Toumi, B Jarboui, M Eddaly, A Rebaï 2013 International Conference on Control, Decision and Information …, 2013 | 3 | 2013 |
New lower bounds for the blocking flowshop scheduling problem to minimize the total completion time criterion S Toumi, B Jarboui, M Eddaly, A Rebaï 2013 5th international conference on modeling, simulation and applied …, 2013 | 3 | 2013 |
Branch and bound algorithm for solving blocking flowshop scheduling problem with total tardiness S Toumi, B Jarboui, M Eddaly, A Rebaï 2013 International Conference on Control, Decision and Information …, 2013 | 2 | 2013 |
VNS’14 M Cheikh, G Chahtour, M Eddaly, A Mjirda, O Mlayeh, S Toumi | | 2014 |