关注
Toumi Said
Toumi Said
在 mu.edu.sa 的电子邮件经过验证
标题
引用次数
引用次数
年份
Asymmetric causality among renewable energy consumption, CO2 emissions, and economic growth in KSA: evidence from a non-linear ARDL model
S Toumi, H Toumi
Environmental Science and Pollution Research 26, 16145-16156, 2019
1202019
A variable neighborhood search algorithm for the capacitated vehicle routing problem
M Amous, S Toumi, B Jarboui, M Eddaly
Electronic Notes in Discrete Mathematics 58, 231-238, 2017
492017
Investigation of the N-shaped environmental Kuznets curve for COVID-19 mitigation in the KSA
A Aljadani, H Toumi, S Toumi, M Hsini, B Jallali
Environmental Science and Pollution Research 28, 29681-29700, 2021
372021
Branch-and-bound algorithm for solving blocking flowshop scheduling problems with makespan criterion
S Toumi, B Jarboui, M Eddaly, A Rebaï
International Journal of Mathematics in Operational Research 10 (1), 34-48, 2017
262017
GVNS based heuristic for solving the multi-product multi-vehicle inventory routing problem
S Hasni, S Toumi, B Jarboui, A Mjirda
Electronic Notes in Discrete Mathematics 58, 71-78, 2017
152017
0–1 quadratic knapsack problem solved with vns algorithm
S Toumi, M Cheikh, B Jarboui
Electronic Notes in Discrete Mathematics 47, 269-276, 2015
122015
Branch and bound algorithm for solving blocking flowshop scheduling problem with total tardiness and total weighted tardiness criteria
S Toumi, B Jarboui, M Eddaly, A Rebaï
International Journal of Operational Research 30 (4), 441-459, 2017
112017
MILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags
I Hamdi, S Toumi
Journal of Industrial Engineering International 15, 223-229, 2019
72019
Lower bounds on the total tardiness and total weighted tardiness for scheduling flowshop with blocking
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 International Conference on Advanced Logistics and Transport, 296-301, 2013
42013
An efficient branch and bound algorithm to solve the permutation flowshop scheduling problem with blocking constraints
S Toumi, B Jarboui, M Eddaly, A Rebai
2013 5th International Conference on Modeling, Simulation and Applied …, 2013
42013
Solving blocking flowshop scheduling problem with branch and bound algorithm
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 International Conference on Advanced Logistics and Transport, 411-416, 2013
32013
Branch and bound algorithm for solving blocking flowshop scheduling problem with total completion time
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 International Conference on Control, Decision and Information …, 2013
32013
New lower bounds for the blocking flowshop scheduling problem to minimize the total completion time criterion
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 5th international conference on modeling, simulation and applied …, 2013
32013
Branch and bound algorithm for solving blocking flowshop scheduling problem with total tardiness
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 International Conference on Control, Decision and Information …, 2013
22013
VNS’14
M Cheikh, G Chahtour, M Eddaly, A Mjirda, O Mlayeh, S Toumi
2014
系统目前无法执行此操作,请稍后再试。
文章 1–15