Construction and demolition waste management contributing factors coupled with reduce, reuse, and recycle strategies for effective waste management: A review K Kabirifar, M Mojtahedi, C Wang, VWY Tam Journal of cleaner production 263, 121265, 2020 | 471 | 2020 |
Improving construction and demolition waste collection service in an urban area using a simheuristic approach: A case study in Sydney, Australia M Yazdani, K Kabirifar, BE Frimpong, M Shariati, M Mirmozaffari, ... Journal of Cleaner Production 280, 124138, 2021 | 306 | 2021 |
Effect of pumice powder and nano-clay on the strength and permeability of fiber-reinforced pervious concrete incorporating recycled concrete aggregate P Mehrabi, M Shariati, K Kabirifar, M Jarrah, H Rasekh, NT Trung, ... Construction and Building Materials 287, 122652, 2021 | 200 | 2021 |
The impact of engineering, procurement and construction (EPC) phases on project performance: a case of large-scale residential construction project K Kabirifar, M Mojtahedi Buildings 9 (1), 15, 2019 | 121 | 2019 |
A novel machine learning approach combined with optimization models for eco-efficiency evaluation M Mirmozaffari, M Yazdani, A Boskabadi, H Ahady Dolatsara, K Kabirifar, ... Applied Sciences 10 (15), 5210, 2020 | 87 | 2020 |
Impact of elevated temperatures on the structural performance of recycled rubber concrete: Experimental and mathematical modeling HA Bengar, AA Shahmansouri, NAZ Sabet, K Kabirifar, VWY Tam Construction and Building Materials 255, 119374, 2020 | 84 | 2020 |
A conceptual foundation for effective construction and demolition waste management K Kabirifar, M Mojtahedi, CC Wang, TV WY Cleaner Engineering and Technology 1, 100019, 2020 | 73 | 2020 |
Effective construction and demolition waste management assessment through waste management hierarchy; a case of Australian large construction companies K Kabirifar, M Mojtahedi, CC Wang, VWY Tam Journal of cleaner production 312, 127790, 2021 | 70 | 2021 |
Production scheduling of off-site prefabricated construction components considering sequence dependent due dates M Yazdani, K Kabirifar, AM Fathollahi-Fard, M Mojtahedi Environmental Science and Pollution Research, 1-17, 2021 | 60 | 2021 |
A novel artificial intelligent approach: Comparison of machine learning tools and algorithms based on optimization DEA Malmquist productivity index for eco-efficiency evaluation M Mirmozaffari, E Shadkam, SM Khalili, K Kabirifar, R Yazdani, ... International journal of energy sector management 15 (3), 523-550, 2021 | 60 | 2021 |
A systematic review of construction and demolition waste management in Australia: Current practices and challenges K Kabirifar, M Mojtahedi, CC Wang Recycling 6 (2), 34, 2021 | 55 | 2021 |
A synthesis of express analytic hierarchy process (EAHP) and partial least squares-structural equations modeling (PLS-SEM) for sustainable construction and demolition waste … K Ghafourian, K Kabirifar, A Mahdiyar, M Yazdani, S Ismail, VWY Tam Recycling 6 (4), 73, 2021 | 40 | 2021 |
Selecting appropriate risk response strategies considering utility function and budget constraints: A case study of a construction company in Iran M Safaeian, AM Fathollahi-Fard, K Kabirifar, M Yazdani, M Shapouri Buildings 12 (2), 98, 2022 | 38 | 2022 |
Influence of organisational culture on total quality management implementation in the Australian construction industry C Coelho, M Mojtahedi, K Kabirifar, M Yazdani Buildings 12 (4), 496, 2022 | 37 | 2022 |
The alignment of Australia’s National construction code and the Sendai framework for disaster risk reduction in achieving resilient buildings and communities W Wei, M Mojtahedi, M Yazdani, K Kabirifar Buildings 11 (10), 429, 2021 | 24 | 2021 |
Cybernetic-parsimonious MCDM modeling with application to the adoption of Circular Economy in waste management K Kabirifar, M Ashour, M Yazdani, A Mahdiyar, M Malekjafarian Applied Soft Computing 139, 110186, 2023 | 12 | 2023 |
Optimising post-disaster waste collection by a deep learning-enhanced differential evolution approach M Yazdani, K Kabirifar, M Haghani Engineering Applications of Artificial Intelligence 132, 107932, 2024 | 5 | 2024 |
A lion optimization algorithm for an integrating maintenance planning and production scheduling problem with a total absolute deviation of completion times objective R Yazdani, M Alipour-Vaezi, K Kabirifar, A Salahi Kojour, F Soleimani Soft Computing 26 (24), 13953-13968, 2022 | 3 | 2022 |
Architects’ Behaviour Towards Implementing Construction and Demolition Waste Minimisation Strategies: The Case of Australia K Kabirifar, M Mojtahedi, CC Wang Circular Economy for Buildings and Infrastructure: Principles, Practices and …, 2024 | | 2024 |
Effective Construction and Demolition Waste Management Assessment: A case of Australian Large Construction Companies K Kabirifar UNSW Sydney, 2022 | | 2022 |