Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis H Kia, H Davoudpour, M Zandieh International Journal of Production Research 48 (14), 4019-4042, 2010 | 40 | 2010 |
Vehicle routing and scheduling in cross docks with forward and reverse logistics Y Kaboudani, SH Ghodsypour, H Kia, A Shahmardan Operational Research 20, 1589-1622, 2020 | 34 | 2020 |
New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times H Kia, SH Ghodsypour, H Davoudpour Journal of Industrial Engineering International 13, 297-306, 2017 | 16 | 2017 |
A hybrid metaheuristic approach for solving a bi-objective capacitated electric vehicle routing problem with time windows and partial recharging F Zahedi, H Kia, M Khalilzadeh Journal of Advances in Management Research 20 (4), 695-729, 2023 | 8 | 2023 |
A hybrid imperialist competitive algorithm for solving economic lot and delivery scheduling problem in a four-stage supply chain H Kia, SH Ghodsypour, H Davoudpour Advances in mechanical engineering 9 (2), 1687814016686893, 2017 | 7 | 2017 |
Design of a Pharmaceutical supply chain under uncertainty and reverse logistic D Foroughi, H Kia Journal of Transportation Research, 2022 | 1 | 2022 |
A Fuzzy Bi-objective Mathematical Model for Perishable Medical Goods Supply Chain Network Considering Crisis Situations: An Empirical Study F Shahrabadi, H Kia, A Heidari, M Khalilzadeh Health Services Insights 17, 11786329241288772, 2024 | | 2024 |
Sustainable multi-objective two-echelon capacitated vehicle routing problem with simultaneous pickup and delivery for perishable products R Shokri Busjin, H Kia Journal of Transportation Research, 2022 | | 2022 |
A Multi-Objective Mathematical Model for Designing Energy Solar Power Plants' Location and Applicants' Allocation under Uncertainties M Raouf, H Tohidi, SMSA Akbar, HR Kia NeuroQuantology 20 (15), 7114, 2022 | | 2022 |
A Hybrid Algorithm for Solving Economic Lot and Delivery Scheduling Problems in a Three-echelon Supply Chain H Kia, SH Ghodsypour, H Davoudpour, C O'Brien Proceeding of the 19th International Working Seminar on Production Economics …, 2016 | | 2016 |
A simulation analysis for solving multi-objective dynamic flexible flow line problem with sequence-dependent setup times by evolving scheduling rules using gentic programming H Kia, SH Ghodsypour, H Davoudpour, C O'Brien Proceeding of the 17th International Working Seminar on Production Economics …, 2012 | | 2012 |
Upper lomit for the consistency in Group Decision-Making using AHP H Kia, SH Ghodsypour, C O'Brien Proceeding of the 17th International Working Seminar on Production Economics …, 2012 | | 2012 |
An experimental study of scheduling a dynamic hybrid flow shop with sequence-dependent setup times SMT Fatemi Ghomi, H Kia Proceeding of the 3th Iranian Opreation Research conference, Amirkabir …, 2010 | | 2010 |
Comparing Two Replenishment Policy for Solving Economic Lot and Delivery Scheduling Problems in a Three-echelon Supply Chain H Kia, SH Ghodsypour | | |