Cost estimation model for building projects using case-based reasoning SH Ji, M Park, HS Lee Canadian Journal of Civil Engineering 38 (5), 570-581, 2011 | 92 | 2011 |
Case adaptation method of case-based reasoning for construction cost estimation in Korea SH Ji, M Park, HS Lee Journal of Construction Engineering and Management 138 (1), 43-52, 2012 | 77 | 2012 |
Strategies for design-build in Korea using system dynamics modeling M Park, SH Ji, HS Lee, W Kim Journal of construction engineering and management 135 (11), 1125-1137, 2009 | 76 | 2009 |
Covariance effect analysis of similarity measurement methods for early construction cost estimation using case-based reasoning J Ahn, M Park, HS Lee, SJ Ahn, SH Ji, K Song, BS Son Automation in Construction 81, 254-266, 2017 | 64 | 2017 |
Data preprocessing–based parametric cost model for building projects: Case studies of Korean construction projects SH Ji, M Park, HS Lee Journal of Construction Engineering and Management 136 (8), 844-853, 2010 | 57 | 2010 |
Performance evaluation of normalization-based CBR models for improving construction cost estimation J Ahn, SH Ji, SJ Ahn, M Park, HS Lee, N Kwon, EB Lee, Y Kim Automation in Construction 119, 103329, 2020 | 47 | 2020 |
The attribute impact concept: Applications in case-based reasoning and parametric cost estimation J Ahn, SH Ji, M Park, HS Lee, S Kim, SW Suh Automation in construction 43, 195-203, 2014 | 46 | 2014 |
Military facility cost estimation system using case-based reasoning in Korea SH Ji, M Park, HS Lee, J Ahn, N Kim, B Son Journal of Computing in Civil Engineering 25 (3), 218-231, 2011 | 43 | 2011 |
Cost estimation model using modified parameters for construction projects SH Ji, J Ahn, HS Lee, K Han Advances in Civil Engineering 2019 (1), 8290935, 2019 | 41 | 2019 |
Floor-level construction material layout planning model considering actual travel path M Park, Y Yang, HS Lee, S Han, S Ji Journal of construction engineering and management 138 (7), 905-915, 2012 | 22 | 2012 |
Schematic cost estimation method using case-based reasoning: Focusing on determining attribute weight MS Park, KH Seong, HS Lee, SH Ji, SY Kim Korean journal of construction engineering and management 11 (4), 22-31, 2010 | 17 | 2010 |
Learning method for knowledge retention in CBR cost models SH Ji, J Ahn, EB Lee, Y Kim Automation in Construction 96, 65-74, 2018 | 14 | 2018 |
Similarity measurement method of case-based reasoning for conceptual cost estimation SH Ji, M Park, H Lee, Y Yoon Proceeding of the International Conference on Computing in Civil and …, 2010 | 13 | 2010 |
Cost estimation methodology using database layer in construction projects KJ Han, HS Lee, M Park, SH Ji Proceedings of the 25th International Symposium on Automation and Robotics …, 2008 | 11 | 2008 |
Method of quantity data analysis for building construction cost estimation: Focusing on finish work of public apartment project SH Ji, MS Park, HS Lee, KH Seong, YS Yoon Korean Journal of Construction Engineering and Management 9 (6), 235-243, 2008 | 11 | 2008 |
Scenario‐Planning Method for Cost Estimation Using Morphological Analysis SH Ji, J Ahn Advances in Civil Engineering 2019 (1), 4962653, 2019 | 8 | 2019 |
A decision support system for super tall building development JS Lee, HS Lee, MS Park, SH Ji The Structural Design of Tall and Special Buildings 22 (16), 1230-1247, 2013 | 6 | 2013 |
Analyzing characteristics of design-build delivery system in Korea using system dynamics modeling HS Lee, SH Ji, MS Park, SH Song Korean Journal of Construction Engineering and Management 8 (5), 119-131, 2007 | 6 | 2007 |
A method of assigning weight values for qualitative attributes in CBR cost model HS Lee, SY Kim, MS Park, SH Ji, KH Seong, JH Pyeon Korean Journal of Construction Engineering and Management 12 (1), 53-61, 2011 | 5 | 2011 |
Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects KH Seong, MS Park, HS Lee, SH Ji Proceedings of the Korean Institute of Construction Engineering and …, 2008 | 5 | 2008 |