关注
Jianguang Feng
Jianguang Feng
在 nwpu.edu.cn 的电子邮件经过验证
标题
引用次数
引用次数
年份
Bi-objective optimization for multi-floor facility layout problem with fixed inner configuration and room adjacency constraints
A Che, Y Zhang, J Feng
Computers & Industrial Engineering 105, 265-276, 2017
592017
Robust optimization for the cyclic hoist scheduling problem
A Che, J Feng, H Chen, C Chu
European Journal of Operational Research 240 (3), 627-636, 2015
462015
An improved mixed integer programming approach for multi-hoist cyclic scheduling problem
A Che, W Lei, J Feng, C Chu
IEEE Transactions on Automation Science and Engineering 11 (1), 302-309, 2013
372013
Bi-objective cyclic scheduling in a robotic cell with processing time windows and non-Euclidean travel times
J Feng, A Che, N Wang
International Journal of Production Research 52 (9), 2505-2518, 2014
362014
Dynamic hoist scheduling problem with multi-capacity reentrant machines: a mixed integer programming approach
J Feng, A Che, C Chu
Computers & Industrial Engineering 87, 611-620, 2015
322015
Novel integer linear programming models for the facility layout problem with fixed-size rectangular departments
J Feng, A Che
Computers & Operations Research 95, 163-171, 2018
292018
Cyclic jobshop hoist scheduling with multi-capacity reentrant tanks and time-window constraints
J Feng, C Chu, A Che
Computers & Industrial Engineering 120, 382-391, 2018
242018
Tabu-Based Adaptive Large Neighborhood Search for Multi-Depot Petrol Station Replenishment With Open Inter-Depot Routes
A Che, W Wang, X Mu, Y Zhang, J Feng
IEEE Transactions on Intelligent Transportation Systems 24 (1), 316-330, 2022
142022
Real‐time hoist scheduling for multistage material handling process under uncertainties
N Tian, A Che, J Feng
AIChE Journal 59 (4), 1046-1048, 2013
142013
Energy-efficient unrelated parallel machine scheduling with general position-based deterioration
Y Wang, A Che, J Feng
International Journal of Production Research 61 (17), 5886-5900, 2023
92023
A note on integrated disassembly line balancing and routing problem
J Feng, A Che
International Journal of Production Research 61 (9), 3144-3150, 2022
62022
Scheduling robotic cells with fixed processing times or time windows: Classification, solution approaches, polynomial algorithms and complexity
J Feng, A Che, C Chu, E Levner, V Kats
European Journal of Operational Research 319 (2), 468-483, 2024
22024
Robotic cell cyclic scheduling considering cell layout
J Feng, A Che
Proceedings of the 32nd Chinese Control Conference, 2622-2626, 2013
22013
Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint
A Che, S Zhang, Y Zhang, J Feng
Journal of Industrial and Management Optimization 19 (10), 7522-7539, 2023
12023
Modélisation et optimisation des Hoist Scheduling Problems
J Feng
Université Paris Saclay (COmUE); Northwestern Polytechnical University (Chine), 2017
12017
Efficient Adaptive Large Neighborhood Search for Sensor–Weapon–Target Assignment
Y Wang, J Wang, JK Hao, J Feng
IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2024
2024
Erratum for “Planning production and equipment qualification under high process flexibility”
J Feng, H Li, WT Huh, MC Sampaio, N Keng
Production and Operations Management 31 (4), 1890-1892, 2022
2022
系统目前无法执行此操作,请稍后再试。
文章 1–17