关注
Behzad Ghodrati
Behzad Ghodrati
Professor
在 ltu.se 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Reliability and operating environment‐based spare parts estimation approach: A case study in Kiruna Mine, Sweden
B Ghodrati, U Kumar
Journal of Quality in Maintenance Engineering 11 (2), 169-184, 2005
1492005
Reliability analysis of drum shearer machine at mechanized longwall mines
S Hadi Hoseinie, M Ataei, R Khalokakaie, B Ghodrati, U Kumar
Journal of quality in maintenance engineering 18 (1), 98-119, 2012
1072012
Operating environment-based spare parts forecasting and logistics: a case study
B Ghodrati, U Kumar
International Journal of Logistics: Research and Applications 8 (2), 95-105, 2005
882005
Reliability and operating environment based spare parts planning
B Ghodrati
Luleå tekniska universitet, 2005
772005
Spare parts estimation and risk assessment conducted at Choghart Iron Ore Mine: A case study
B Ghodrati, PA Akersten, U Kumar
Journal of Quality in Maintenance Engineering 13 (4), 353-363, 2007
582007
Downtime analysis of drilling machines and suggestions for improvements
HS Al-Chalabi, J Lundberg, A Wijaya, B Ghodrati
Journal of Quality in Maintenance Engineering 20 (4), 306-332, 2014
412014
Product support improvement by considering system operating environment: A case study on spare parts procurement
B Ghodrati, D Benjevic, A Jardine
International Journal of Quality & Reliability Management 29 (4), 436-450, 2012
392012
Reliability analysis of the cable system of drum shearer using the power law process model
SH Hoseinie, M Ataei, R Khalokakaie, B Ghodrati, U Kumar
International journal of mining, reclamation and environment 26 (4), 309-323, 2012
382012
Mine production index (MPI)-extension of OEE for bottleneck detection in mining
AA Lanke, SH Hoseinie, B Ghodrati
International Journal of Mining Science and Technology 26 (5), 753-760, 2016
332016
Reliability considerations in automated mining systems
B Ghodrati, S Hadi Hoseinie, AHS Garmabaki
International journal of mining, reclamation and environment 29 (5), 404-418, 2015
322015
Activity-based life cycle cost analysis as an alternative to conventional LCC in engineering design
D Kayrbekova, T Markeset, B Ghodrati
International Journal of System Assurance Engineering and Management 2, 218-225, 2011
292011
Developing effective spare parts estimations results in improved system availability
B Ghodrati, D Banjevic, AKS Jardine
2010 Proceedings-Annual Reliability and Maintainability Symposium (RAMS), 1-6, 2010
252010
Weibull and exponential renewal models in spare parts estimation: a comparison
B Ghodrati
International Journal of Performability Engineering 2 (2), 135, 2006
252006
Mine production index (MPI): new method to evaluate effectiveness of mining machinery
A Lanke, H Hoseinie, B Ghodrati
International Journal of Geological and Environmental Engineering 8 (11 …, 2014
232014
Reliability and spare parts estimation taking into consideration the operational environment—a case study
A Barabadi, B Ghodrati, J Barabady, T Markeset
2012 IEEE international conference on industrial engineering and engineering …, 2012
222012
Optimal pricing and terminal location for a rail–truck intermodal service–a case study
R Dandotiya, R Nath Banerjee, B Ghodrati, A Parida
International Journal of Logistics Research and Applications 14 (5), 335-349, 2011
222011
An approach for risk assessment of rail defects
S Kumar, S Gupta, B Ghodrati, U Kumar
International Journal of Reliability, Quality and Safety Engineering 17 (04 …, 2010
212010
Operating environment-based availability importance measures for mining equipment (case study: sungun copper mine)
A Nouri Qarahasanlou, R Khalokakaie, M Ataei, B Ghodrati
Journal of Failure Analysis and Prevention 17, 56-67, 2017
202017
Modeling and simulation approaches for reliability analysis of drilling machines
MJ Rahimdel, M Ataei, B Ghodrati
Journal of The Institution of Engineers (India): Series C 101, 125-133, 2020
192020
Identifying the mixed effects of unobserved and observed risk factors on the reliability of mining hauling system
Z Allahkarami, AR Sayadi, B Ghodrati
International Journal of System Assurance Engineering and Management 12 (2 …, 2021
152021
系统目前无法执行此操作,请稍后再试。
文章 1–20