Branch-and-price approach for the multi-skill project scheduling problem C Montoya, O Bellenguez-Morineau, E Pinson, D Rivreau Optimization Letters 8, 1721-1734, 2014 | 71 | 2014 |
Petri nets and deadlock-free scheduling of open shop manufacturing systems G Mejía, JP Caballero-Villalobos, C Montoya IEEE Transactions on Systems, Man, and Cybernetics: Systems 48 (6), 1017-1028, 2017 | 34 | 2017 |
A Petri Net-based framework for realistic project management and scheduling: An application in animation and videogames G Mejía, K Niño, C Montoya, MA Sánchez, J Palacios, L Amodeo Computers & Operations Research 66, 190-198, 2016 | 34 | 2016 |
Petri nets and genetic algorithms for complex manufacturing systems scheduling G Mejía, C Montoya, J Cardona, AL Castro International Journal of Production Research 50 (3), 791-803, 2012 | 33 | 2012 |
Scheduling manufacturing systems with blocking: a Petri net approach G Mejia, C Montoya International Journal of Production Research 47 (22), 6261-6277, 2009 | 27 | 2009 |
A Petri Net based algorithm for minimizing total tardiness in flexible manufacturing systems G Mejía, C Montoya Annals of Operations Research 164, 63-78, 2008 | 18 | 2008 |
Food donation: An initiative to mitigate hunger in the world G Mejia, CM Argueta, V Rangel, C García-Díaz, C Montoya, II Agudelo 2015 Meeting Urban Food Needs (MUFN) Programme, July 1, 2015, Rome, Italy, 2015 | 17 | 2015 |
Integrated column generation and lagrangian relaxation approach for the multi-skill project scheduling problem C Montoya, O Bellenguez-Morineau, E Pinson, D Rivreau Handbook on Project Management and Scheduling Vol. 1, 565-586, 2015 | 15 | 2015 |
Applications of resource assignment and scheduling with Petri Nets and heuristic search G Mejía, C Montoya Annals of Operations Research 181, 795-812, 2010 | 13 | 2010 |
Job shop rescheduling with rework and reconditioning in Industry 4.0: an event-driven approach G Mejía, C Montoya, S Bolívar, DA Rossit The International Journal of Advanced Manufacturing Technology, 1-17, 2022 | 9 | 2022 |
Design of a CPFR, Location, Inventory and Routing Approach to Diabetes and High Blood Pressure Medicine Supply Network Planning FAC Urbina, MP Caro, C Montoya Ingeniería y universidad 25, 6, 2021 | 7 | 2021 |
Adaptación y pilotaje de un protocolo de activación conductual grupal sobre conductas depresivas D Garcés, PC Romero, JM Bianchi, CE Montoya Fundación Universitaria Konrad Lorenz, Bogotá, Colombia, 2017 | 7 | 2017 |
Proyecto de escuela de coaching para emprendedores como actores principales del desarrollo de la economía nacional C Montoya, H Noriega, R Sánchez, F Urbina Recuperado de https://repositorioacademico. upc. edu. pe/bitstream/handle …, 2016 | 5 | 2016 |
New models for the multi-skill project scheduling problem C Montoya, O Bellenguez-Morineau, D Rivreau Euro 2010 (European conference on operational research), 2010 | 5 | 2010 |
Protocolo grupal BATD-R: Adaptación y efecto en estudiantes con síntomas depresivos DAG Rojas, PCR Moreno, JMB Salguero, CE Montoya Acta Comportamentalia: Revista Latina de Análisis de Comportamiento 30 (1), 7-28, 2022 | 3 | 2022 |
Batch Assignment of Parallel Machines in an Automotive Safety Glass Manufacturing Facility JF Mora, RN Abdallah, AJ Lozano, C Montoya, RO Caicedo Ingeniería y universidad 24, 1-21, 2020 | 3 | 2020 |
Heuristic Algorithm for Workforce Scheduling Problems C Montoya, G Mejía Brazilian Journal of Operations & Production Management 3 (2), 35-48, 2006 | 3 | 2006 |
Escala de Activación Conductual para la Depresión (BADS): Confiabilidad, Estructura Interna y otras Evidencias de Validez en Bogotá DA Leal-Hernández, JM Bianchi, CE Montoya, JA Villalba-Garzón Revista Iberoamericana de Diagnóstico y Evaluación-e Avaliação Psicológica …, 2023 | 2 | 2023 |
Reliability and Validity of a Brief Self-Report Questionnaire for the Diagnosis of Social Phobia CA Rey-Anacona, DC Mejía, CE Montoya Universitas Psychologica 7 (2), 477-491, 2008 | 2 | 2008 |
Resource Assingment And Scheduling Using Petri Nets And Heuristic Search G Mejía, C Montoya Proceedings of the ICPR 19 (International conference on production research), 2007 | 1 | 2007 |