Ekonomi Rekayasa DM Mangitung Penerbit Andi, Yogyakarta, 2013 | 31 | 2013 |
Development of a multiple modes simulator of rotating bladed assemblies for blade tip-timing data analysis J Gallego-Garrido, G Dimitriadis, JR Wright 2002 International Conference on Noise and Vibration Engineering, 2002 | 19 | 2002 |
Decision criteria for periodic prequalification in the UK construction industry DM Mangitung, MW Emsley Proceedings of the RICS foundation construction and building research …, 2002 | 18 | 2002 |
Decision criteria for periodic and project prequalification practices in the UK DM Mangitung, M Emsley Proceedings of the 10th International CIB Symposium of the W65 Commission on …, 2002 | 9 | 2002 |
Typical contractor prequalification characteristics of public procurement practices in Indonesia DM Mangitung Construction Building Research Conference (COBRA) 2010, 2010 | 8 | 2010 |
Factors Affecting E-Tendering Process Based on The Perceptions of The Contractors Being Involved in The Tadulako University’s Construction Projects DM Mangitung, DE Novitasari The 6th International Conference on Engineering, Project, and Production …, 2015 | 7 | 2015 |
Modelling the influence of periodic prequalification criteria on project performance DM Mangitung PQDT-Global, 2005 | 7 | 2005 |
Identifikasi Dimensi Baru Kriteria Evaluasi Kompotensi Kontraktor di Kabupaten Banggai dengan Metoda Analisis Faktor DM Mangitung SMARTek 4 (1), 2006 | 6 | 2006 |
Analisis Dampak Percepatan Jadwal Proyek Terhadap Biaya Konstruksi Dengan Teknik Statistika Non Parametrik DM Mangitung SMARTek 6 (2), 221970, 2008 | 4 | 2008 |
Active participation P3A in management of irrigation network groundwater (JIAT) in regional areas of surface water at central Sulawesi province, Indonesia Zeffitni, S Lipu, DM Mangitung International Journal of Civil Engineering and Technology 8 (10), 1161–1169, 2017 | 3 | 2017 |
Factors influencing contractors being involved in prequalification DM Mangitung Construction Building Research Conference (COBRA) 2010, 2010 | 3 | 2010 |
Faktor-Faktor yang Penting dalam Sistem Penilaian Kompetensi Kontraktor Berdasarkan Persepsi Kontraktor di Kota Palu DM Mangitung MEKTEK 8 (1), 2006 | 3 | 2006 |
Important factors influencing the successful implementation of electronic tenders based on the perceptions of consultants, contractors and project owners in Palu DM Mangitung, AH Asikin, GR Ningsih, SS Ningrum IOP Conference Series: Earth and Environmental Science 1075 (1), 012036, 2022 | 2 | 2022 |
Standardisation of periodic prequalification criteria through identification of the relationship between prequalification factors and project performance DM Mangitung, MW Emsley The First International Conference on Information Standardisation, Exchanges …, 2002 | 2 | 2002 |
Factors affecting the weighting of contractor prequalification decision criteria: the UK prequalifiers’ perception DM Mangitung, MW Emsley The 3rd International Conference on Decision Making in Urban and Civil …, 2002 | 2 | 2002 |
Analisis faktor yang mempengaruhi keberhasilan tender eletronik berdasarkan persepsi kontraktor di palu DM Mangitung Jurnal Sains dan Teknologi Tadulako 8 (1), 1-8, 2022 | 1 | 2022 |
Identification of Damage Level and Cost Estimate of Building Maintenance of Elementary School F Fahruddin, DM Mangitung, A Rizal MATEC Web of Conference 331 (01005), 1-9, 2020 | 1 | 2020 |
Kerangka Konsep Pengadaan Jasa Kontraktor DM Mangitung SMARTek 4 (4), 2006 | 1 | 2006 |
Identification of The Need For Construction Expert In Donggala Regency M Labombang, DM Mangitung, F Fahruddin IOP Conference Series: Earth and Environmental Science 1355 (1), 012042, 2024 | | 2024 |
Factors affecting the delay of the road maintenance project in the application of the long segment method in the Central Sulawesi EP Galih, DM Mangitung, TM Kamaluddin International Journal of Innovative Research in Advanced Engineering 6 (12 …, 2019 | | 2019 |