Exact algorithm for matrix-based project planning problems ZT Kosztyán Expert Systems with Applications 42 (9), 4460-4473, 2015 | 56 | 2015 |
Hybrid time-quality-cost trade-off problems ZT Kosztyán, I Szalkai Operations Research Perspectives 5, 306-318, 2018 | 36 | 2018 |
SIMILAR–Systematic iterative multilayer literature review method ZT Kosztyan, T Csizmadia, AI Katona Journal of Informetrics 15 (1), 101111, 2021 | 27 | 2021 |
Multimode resource-constrained project scheduling in flexible projects ZT Kosztyán, I Szalkai Journal of Global Optimization 76 (1), 211-241, 2020 | 27 | 2020 |
Navigation methods of special needs users in multimedia systems R Mátrai, ZT Kosztyán, C Sik-Lányi Computers in Human Behavior 24 (4), 1418-1433, 2008 | 27 | 2008 |
Rankings or leagues or rankings on leagues?-Ranking in fair reference groups ZT Kosztyán, Z Banász, VV Csányi, A Telcs Tertiary Education and Management 25 (4), 289-310, 2019 | 25 | 2019 |
The Settlement Structure Is Reflected in Personal Investments: Distance‐Dependent Network Modularity‐Based Measurement of Regional Attractiveness L Gadar, ZT Kosztyan, J Abonyi Complexity 2018 (1), 1306704, 2018 | 24 | 2018 |
Analysis of Hungarian students’ college choices A Telcs, ZT Kosztyan, I Neumann-Virag, A Katona, A Torok Procedia-Social and Behavioral Sciences 191, 255-263, 2015 | 23 | 2015 |
Unbiased one-dimensional university ranking–application-based preference ordering A Telcs, ZT Kosztyan, A Toeroek Journal of Applied Statistics 43 (1), 212-228, 2016 | 22 | 2016 |
Matrix-based color measurement corrections of tristimulus colorimeters ZT Kosztyán, GP Eppeldauer, JD Schanda Applied optics 49 (12), 2288-2301, 2010 | 22 | 2010 |
A multilayer and spatial description of the Erasmus mobility network L Gadar, ZT Kosztyan, A Telcs, J Abonyi Scientific Data 7 (1), 41, 2020 | 21 | 2020 |
An exact algorithm for the flexible multilevel project scheduling problem ZT Kosztyán Expert Systems with Applications 158, 113485, 2020 | 20 | 2020 |
PEM–a New Matrix Method for Supporting the Logic Planning ofSoftware Development Projects ZT Kosztyán, J Kiss DSM 2010: Proceedings of the 12th International DSM Conference, Cambridge …, 2010 | 19 | 2010 |
Hybrid multimode resource-constrained maintenance project scheduling problem ZT Kosztyán, A Pribojszki-Németh, I Szalkai Operations Research Perspectives 6, 100129, 2019 | 18 | 2019 |
Hallgatói preferencia-sorrendek készítése egyetemi jelentkezések alapján A Telcs, ZT Kosztyán, Á Török Közgazdasági Szemle 60, 2013 | 18 | 2013 |
Risk-Based X-bar chart with variable sample size and sampling interval ZT Kosztyán, AI Katona Computers & Industrial Engineering 120, 308-319, 2018 | 17 | 2018 |
A new method for the characterization of the perspicuity of user interfaces R Mátrai, ZT Kosztyán Acta Polytechnica Hungarica 9 (1), 139-156, 2012 | 17 | 2012 |
Survive IT! Survival analysis of IT project planning approaches ZT Kosztyán, R Jakab, G Novák, C Hegedűs Operations Research Perspectives 7, 100170, 2020 | 15 | 2020 |
Using multimedia interactive e-teaching in color science CS Lanyi, Z Kosztyan, B Kranicz, J Schanda, M Navvab Leukos 4 (1), 71-82, 2007 | 15 | 2007 |
Network-based dimensionality reduction of high-dimensional, low-sample-size datasets ZT Kosztyán, MT Kurbucz, AI Katona Knowledge-Based Systems 251, 109180, 2022 | 14 | 2022 |