Production lead time in serial lines: Evaluation, analysis, and control SM Meerkov, CB Yan IEEE Transactions on Automation Science and Engineering 13 (2), 663-675, 2014 | 47 | 2014 |
Raw material release rates to ensure desired production lead time in Bernoulli serial lines S Biller, SM Meerkov, CB Yan International Journal of Production Research 51 (14), 4349-4364, 2013 | 31 | 2013 |
Process monitoring, diagnosis and control of additive manufacturing Q Fang, G Xiong, MC Zhou, TS Tamir, CB Yan, H Wu, Z Shen, FY Wang IEEE Transactions on Automation Science and Engineering 21 (1), 1041-1067, 2022 | 27 | 2022 |
Efficient simulation method for general assembly systems with material handling based on aggregated event-scheduling Y Zhao, CB Yan, Q Zhao, N Huang, J Li, X Guan IEEE transactions on automation science and engineering 7 (4), 762-775, 2009 | 24 | 2009 |
Problem formulation and solution methodology for energy consumption optimization in Bernoulli serial lines CB Yan, Z Zheng IEEE Transactions on Automation Science and Engineering 18 (2), 776-790, 2020 | 22 | 2020 |
Formulation and a simulation-based algorithm for line-side buffer assignment problem in systems of general assembly line with material handling CB Yan, Q Zhao, N Huang, G Xiao, J Li IEEE Transactions on Automation Science and Engineering 7 (4), 902-920, 2010 | 20 | 2010 |
Where am I parking: Incentive online parking-space sharing mechanism with privacy protection D An, Q Yang, D Li, W Yu, W Zhao, CB Yan IEEE Transactions on Automation Science and Engineering 19 (1), 143-162, 2020 | 19 | 2020 |
An effective and efficient divide-and-conquer algorithm for energy consumption optimisation problem in long Bernoulli serial lines CB Yan, Z Zheng International Journal of Production Research 59 (23), 7018-7036, 2021 | 18 | 2021 |
Robust energy management for a corporate energy system with shift-working V2G S Dai, F Gao, X Guan, CB Yan, K Liu, J Dong, L Yang IEEE Transactions on Automation Science and Engineering 18 (2), 650-667, 2020 | 18 | 2020 |
Equilibria, stability, and transients in re-entrant lines under FBFS and LBFS dispatch and constant release CB Yan, M Hassoun, SM Meerkov IEEE Transactions on Semiconductor Manufacturing 25 (2), 211-229, 2012 | 17 | 2012 |
A unified effective method for aggregating multi-machine stages in production systems CB Yan, Q Zhao IEEE Transactions on Automatic Control 58 (7), 1674-1687, 2013 | 16 | 2013 |
Bernoulli serial lines with batching machines: Performance analysis and system-theoretic properties JQ Wang, FY Yan, PH Cui, CB Yan IISE Transactions 51 (7), 729-743, 2019 | 15 | 2019 |
Analysis and optimization of energy consumption in two-machine Bernoulli lines with general bounds on machine efficiency CB Yan IEEE Transactions on Automation Science and Engineering 18 (1), 151-163, 2020 | 13 | 2020 |
A novel MOEA/D for multiobjective scheduling of flexible manufacturing systems X Wang, K Xing, CB Yan, M Zhou Complexity 2019 (1), 5734149, 2019 | 13 | 2019 |
Analytical approach to estimate efficiency of series machines in production lines CB Yan, Q Zhao IEEE Transactions on Automation Science and Engineering 15 (3), 1027-1040, 2017 | 13 | 2017 |
Formulation and solution methodology for reducing energy consumption in two-machine Bernoulli serial lines CB Yan, X Cheng, F Gao, X Guan IEEE Transactions on Automation Science and Engineering 19 (1), 522-530, 2020 | 12 | 2020 |
Cellular production lines with asymptotically reliable Bernoulli machines: Lead time analysis and control SM Meerkov, CB Yan IEEE Transactions on Automation Science and Engineering 12 (2), 764-768, 2014 | 12 | 2014 |
Energy consumption control in the two-machine Bernoulli serial production line with setup and idleness Z Pei, P Yang, Y Wang, CB Yan International Journal of Production Research 61 (9), 2917-2936, 2023 | 11 | 2023 |
Consistency guaranteed two-timescale decision and optimization of HVAC system with ice storage Z Nie, W Cheng, G Zhou, X Chen, CB Yan, F Gao International Journal of Electrical Power & Energy Systems 141, 108115, 2022 | 11 | 2022 |
Energy cost optimisation in two-machine Bernoulli serial lines under time-of-use pricing X Cheng, CB Yan, F Gao International Journal of Production Research 60 (13), 3948-3964, 2022 | 10 | 2022 |